background image

Step 11 & 12

You are done with the sorting of 
the panels, so now you can inspect 
the middle lines towards the main 
riser to see if the middle line are 
free.

Packing Manual

 35

34

 Packing Manual

 

Step 13

Now fold the reserve chute with a „double-S fold“ 
and place the reserve container with the line 
pocket in the direction of the base/main riser.

Step 14

Now place the reserve chute like a snake in the
container, taking care to use the full length and
width.

EN

Summary of Contents for Pepper Cross Light 110

Page 1: ...bH Co KG Windeckstr 4 83250 Marquartstein 49 0 8641 69 48 40 info skywalk info www skywalk info MANUAL SERVICE 05 2017 SERIALNO lightweight rescue chute LTF NFL II 91 09 EN 12491 2001 ENGLISH Rev 02 1...

Page 2: ...ute At skywalk we are enthusiastic about wind sports and innovative technologies When we founded skywalk in 2001 our goal was to make paragliders and kites that offer new solu tions to set new impulse...

Page 3: ...40 1 Number of panels 20 20 24 Line length mm 4100 4400 4900 Center line length mm 3930 4280 4500 Weight g 990 1140 1440 Sink Rate m s 5 2 5 2 5 2 Maximum load kg 90 110 135 Nr of EN certification EP...

Page 4: ...ment The reserve chute must be replaced after 10 years even if it has never been used PACKING MANUAL All skywalk PEPPER CROSS LIGHT paraglider reserve chutes are inspected and packed in skywalk s manu...

Page 5: ...IGHT is a cruciform rescue parachute with four corner points so lay out the canopy with one corner at the bottom one on the left one on the right and one on top Start with the first corner at the bot...

Page 6: ...reason for this is to prevent the material from bur ning during a deployment Step 7 Next you will again encounter rec tangular panels until you reach the next corner which is now the up permost and la...

Page 7: ...f the middle line are free Packing Manual 35 34 Packing Manual Step 13 Now fold the reserve chute with a double S fold and place the reserve container with the line pocket in the direction of the base...

Page 8: ...three rescue flaps and secure them with a small line loop This method will avo id burns from a deployment later since the bundle of lines will be released first and will not come in contact with the...

Page 9: ...ING LINK WITH A RUBBER RING A NEOPRENE GUARD OR A FIXING TAPE TO PREVENT WEAR AND SLIPPING MAINTENANCE The skywalk PEPPER CROSS LIGHT rescue should be repacked at least every 6 months as detailed in t...

Page 10: ...roof of packing 41 40 Construction EN CONSTRUCTION PROOF OF PACKING 1 canopy 2 lines 3 corner openings 4 main riser 5 center line PROOF OF PACKING Pilot Name Date Serial no date of packing by signatur...

Page 11: ...42 Notes Notes 43 NOTES NOTES EN...

Page 12: ...Skywalk GmbH Co KG Windeckstr 4 83250 Marquartstein 49 0 8641 69 48 40 info skywalk info www skywalk info...

Reviews: