5
P
ortable
C
art
M
anual
nXG 32 / nXG 42 / nXG 43 / nXG 46
|
Gather the following:
Caster/Wheel to Outrigger Assembly:
4 qty. - Outriggers
4 Casters with bolts, washers, and nuts
Remove each bolt, washer and nut from
each caster and place accordingly. You will
need one of each to complete the assembly.
Next gather an one outrigger and place
the caster in line with the outter hole of
the outrigger.
The correct hole should be closest to the
end which is capped off.
Insert the bolt from the previous step through
the top of the outrigger and caster.
Re apply the washer first then the nut from
the first step and tighten using proper tooling
to secure the caster to the outrigger.
Once this is done reapeat the step three
more times for the remaining casters and
outriggers. Once done proceed to the next
stage of the assembly process.