ZB2044
December 2007
Page 57
TM
Section 2 - Operation
Optional Attachments
2.15-3 Bridge Stripper Attachment
The bridge stripper attachment is used to strip falsework
or temporary support structures at bridge-construction
sites.
Figure 2-23 Bridge Stripper Attachment
Installation Procedure:
1.
Remove fork attachment or other attachment from
boom and install bridge stripper attachment (refer
to
Section 2.13
).
2.
Connect auxiliary hydraulic hoses to attachment.
Operation:
1.
Raise and extend boom to position stripper under
load.
2.
Move rear joystick “
” backward to extend
stripper pins.
3.
Rest load on stripper then lower and retract boom
to appropriate height.
4.
Travel to placement point with load kept as low to
the ground as possible.
5.
Move rear joystick “
” forward to retract stripper
pins and tilt attachment forward to unload.
2.15-4 Pipe and Pole Grappler
Pipe and pole grappler is intended for handling single
and multiple pipes.
Figure 2-24 Pipe and Pole Grappler
Installation Procedure:
1.
Remove fork attachment or other attachment
from boom and install pipe and pole grappler
attachment (refer to
Section 2.13
).
2.
Connect auxiliary hydraulic hoses to attachment.
Operation:
1.
Approach load with grappler’s clamps open.
2.
Insert forks under load and lift it, then tilt grappler
backward so that load will not fall causing possible
injury.
3.
Close primary clamps by pressing and holding
left thumb button “
” and moving the joystick
forward “
”. With joystick pushed forward,
press and hold right thumb button “
” to close
secondary clamps and secure the load in place.
4.
Raise or lower boom to appropriate height and
transport load with caution to placement site.
5.
Position load carefully over placement point. Open
secondary clamps by pressing and holding right
thumb button “
” while moving joystick
backward “
”. With joystick pulled backward,
press and hold the left thumb button “
” to open
primary clamps.
To
order
go
to
Discount-Equipment.com