Section 3 – Familiarization
Optional Attachments
3.6-3 Block Forks
Figure 12
Block Forks
The block forks are used primarily to load/unload and
place cubes of concrete or cement blocks. Block forks
are designed to be accepted on all carriages provided
they are equidistant.
Installation Procedure
1.
Refer to
Section 5.13-4
to change the forks.
IMPORTANT
Ensure the forks are equally spaced.
Operation
1.
Using optional attachment controller, ensure the
carriage attachment and forks are positioned
perpendicular to the load.
2.
Handle load the same as regular fork attachment
ensuring all forks are in contact with the load at
all times (refer to
Section 5.8
and
Section 5.9
).
3.6-4 Jib Boom
Figure 13
Jib Boom
A jib boom is an attachment with a hook or jib
eye load connection. This connection is used for
extending the forward reach and lift height of the
telehandler at the expense of load capacity.
Installation Procedure
1.
Remove fork attachment or other attachment
from boom and connect truss boom attachment
(refer to
Section 5.13-1
and
Section 5.13-2
).
Operation
1.
Using boom controller, adjust jib boom over the
center of the load.
2.
Attach load to the hook using sufficient chains/
cables.
3.
While helpers guide the load, position load at
placement point.
F
A
M
IL
IA
R
IZ
A
T
IO
N
Summary of Contents for SJ643 TH
Page 1: ...OPERATING MANUAL SJ643 TH SJ843 TH TELEHANDLER 216201ADA July 2018 ANSI CSA...
Page 4: ...216201ADA SJ643 TH SJ843 TH 4 Notes...
Page 14: ...216201ADA SJ643 TH SJ843 TH 14 Notes...
Page 65: ...SJ643 TH SJ843 TH 216201ADA 65 Notes...
Page 76: ...216201ADA SJ643 TH SJ843 TH 76 Notes...
Page 82: ...216201ADA SJ643 TH SJ843 TH 82 Notes...
Page 83: ...SJ643 TH SJ843 TH 216201ADA 83 Section 7 Specifications...
Page 88: ...216201ADA SJ643 TH SJ843 TH 88 Notes...
Page 107: ...Cancer and Reproductive Harm https www p65warnings ca gov WARNING...
Page 108: ...www skyjack com...