Page 2
224-G7 Is
sue G Oct
ober 2021
Battery Testing
1. Connect SKC approved charger to battery pack. If charger indicator
LED illuminates, battery pack charger input is ok. If charger LED does
not illuminate, battery pack input fuse is blown - Replace battery pack.
2. Leave battery pack connected to charger to fully charge.
3. If pump does not function at all after full charge of battery pack, battery
pack output fuse has blown, or battery cells have failed or are at end of
life - Replace battery pack.
4. If pump functions after full charge of battery pack but gives significantly
reduced run times before low battery shutdown, battery cells are failing
or are at end of life - Replace battery pack.
Battery Disposal
• This NiMH battery pack falls within the scope of the EU Directive
2006/66/EC and the 2009 UK Regulations on batteries and accumulators
and waste batteries and accumulators. At the end of the battery pack’s
life it must be disposed of in an environmentally sound way as detailed
in the Directive / Regulations.
• Please contact your local distributor or SKC Ltd for further details on
how to comply with the requirements of the Batteries Directive. SKC
Ltd’s batteries producer registration number is BPRN00454.
Battery Warranty
• The warranty period for SKC battery packs, when sold as a replacement,
is six months from the date of the invoice. During this period the battery
pack will be repaired or replaced free of charge, but must be returned
to SKC Ltd.
• The warranty does not cover damage to the battery pack caused
by misuse, failure to use the equipment in accordance with the
manufacturer’s instructions and in accordance with industry standards,
and the use of a non-SKC approved charger to charge the battery.
• Refer to the manufacturer’s Terms and Conditions of Sale for full
warranty details.
SKC Limited
,
11 Sunrise Park, Higher Shaftesbury Road, Blandford Forum, Dorset, DT11 8ST,
United Kingdom
Phone:
+44 (0) 1258 480188
Email:
Web:
www.skcltd.com
Air Sampling Solutions & Expertise