SKC 225-68 Operating Instructions Download Page 2

Page 2

007-04-002 Issue D January 2013

Loading the DPM cassette

As the DPM cassette is pre-assembled, 
all that is required to prepare it for use is 
to remove the red plugs from its inlet and 
outlet ports. Retain the plugs to seal the 
cassette for transport to the laboratory.
Assemble the grit pot, thick O ring and 
insert to the cyclone body. Seat the 
DPM cassette into the red sealing cup 
in the base of the cyclone insert, as 
shown to the right. Fit the thin O ring 
into the recessed channel in the base of 
the outlet funnel. Place the outlet funnel 
centrally on top of the DPM cassette 
and then fit the retaining ring, screwing 
it down firmly to ensure a good seal of 
the inlet and outlet of the cassette.

Sampling with the cyclone

Connect the cyclone outlet to the sample 
pump via a length of flexible tubing. 
Calibrate the pump flow rate using a 
rotameter or other suitable calibrator. 
Connect the rotameter to the sample air 
inlet on the cyclone body with a length of 
flexible tubing. The sample flow rate for the 
DPM cyclone and DPM cassette is 2.0 litre/
min. Once the flow is set to the correct rate 
switch the sample pump off. The sample 
train is now ready for sampling.

After sampling

Unfasten the retaining ring and remove  
the cassette. Immediately refit the red 
plugs to the inlet and outlet ports of the 
cassette to prevent unwanted ingress 
or loss of contaminant during transport 
to the laboratory. It is not necessary to 
supply a blank to the laboratory as the 
DPM cassette contains a built in blank.

Retaining 
ring

Outlet funnel

Air out 
to pump

Thin O ring

DPM 
cassette

Cyclone 
insert

Thick O ring

Cyclone 
body

Grit pot

Sample 
air inlet

SKC Limited 

11 Sunrise Park, Higher Shaftesbury Road, Blandford Forum, Dorset DT11 8ST

 United Kingdom

T: +44 (0) 1258 480188   F: +44 (0) 1258 480184   E: [email protected]   W: www.skcltd.com

A member of the SKC  global group of companies

Reviews: