
H + L = dead zone
Fig. 13: Solar radiation shielding
cover
Fig. 14: Prevention to avoid
intrusion of humidity
Fig. 15: Reflection board
7
The level meter must not be installed in places with direct
solar radiation and must be protected against the effects of local
weather.
If installation in places with direct solar radiation is inevitable, it is
necessary to mount a shielding cover above the level meter (Fig.
13).
It is suitable to run the cable under a cable bushing (obliquely down i n
slack) according to Fig.14 to prevent penetration of humidity into the
housing. In this way, rain and condensing water can flow off freely.
The cable bushing and connector have to be sufficiently tightened to
prevent penetration of humidity.
To lower the minimum distance to the measured medium,
a reflection board made from solid, even and smooth material can
be installed to the level meter. Then the tank can be filled nearly up to
the maximum height. This solution is suitable for open tanks and
reservoirs (Fig. 15).
Installation Manual
Summary of Contents for SLU
Page 11: ...11 Set up elements Status Signalization Installation Manual ...
Page 13: ...13 Basic configuration Operation and Setting Sitron Installation Manual ...
Page 14: ...14 Installation Manual ...
Page 15: ...15 Installation Manual ...
Page 20: ...20 Protocol HART SLU Protocol Modbus SLU M SMC 485 Installation Manual SLU XX SLU ...
Page 22: ...22 Installation Manual SLU XX SLU Menu Structure ...