A
A- PREPARE THE DESIRED DRAINING EQUIPMENT TO ENSURE COMPLETE BACK BOX DRAINAGE IN UNDER 30 MINUTES:
NEW INSTALLATION:
8" TO 12" (20-30cm) OF GRAVEL UNDER THE BACK BOX.
OVER EXISTING SURFACES:
INSTALL A DRAINING PIPE TO THE BACK BOX.
B- REMOVE THE DESIRED KNOCKOUT AND INSTALL AN APPROPRIATE ELECTRICAL CONDUIT (
NOT INCLUDED
) INTO THE BACK BOX.
C- FEED CABLE THROUGHT THE ELECTRICAL CONDUIT.
D- POUR CONCRETE IN AND MAKE SURE THAT THE BACK BOX OPENING IS FLUSH WITH THE CONCRETE.
A + B + C
D
scale 1:12
BACK BOX INSTALLATION
MEGAZIP
WALK-OVER ROUND MODELS: S8500, S8501, S8502, S8568, S8570, S8571, S8572, S8578
WALK-OVER SQUARE MODELS: S8580, S8581, S8582, S8588, S8590, S8591, S8592, S8598
INSTRUCTIONS SHEET
PAGE: 1 of 2
INS-685
9320 Boul. St-Laurent, suite 100, Montréal (Québec) Canada H2N 1N7
P.: 514.523.1339 F.: 514.525.6107 www.sistemalux.com
JP - R0
Last update: April 28, 2021
IMPORTANT -
READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE AND ALL APPLICABLE LOCAL CODES, BY A PERSON FAMILIAR WITH THE
CONSTRUCTION AND OPERATION OF THE PRODUCT, AND THE HAZARDS INVOLVED. PROPER GROUNDING IS REQUIRED FOR SAFETY.
8" - 12"
(20 - 30cm)
BACK BOX
DRAINING PIPE
NO!
OK!
NO!
C
B
CABLE
ELECTRICAL CONDUIT
(NOT INCLUDED)
KNOCKOUT
GRAVEL
BACK BOX
A
CONCRETE
CONCRETE WITH DRAINING PIPE
CONCRETE WITH GRAVEL
BEAM
ORIENTATION
WALL
SPOT, NARROW FLOOD,
FLOOD & ASSYMETRIC OPTIC
BEAM ORIENTATION
90°