background image

 

 

2.1. Overhead installation

 

 

 

Danger of life!
You have to observe the regulations of BGV C1 (formerly VBG 70) and 
EN60598-2-17 
 
 
 

The suspension devices have to be build and measured so they can withstand for an hour the tenfold 
of the payload without suffering a permanent detrimental deformation.
 
Basically installation has to be made by using a second separate suspension. This can 
suitable net. The second suspension must be designed and attached so no part of the installation can 
fall down in case of failure. 
 
During construction, reconstruction and deconstruction unnecessary stay in the range of moving 
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden. 
 
The operator is obliged to following safety
 

Before  the  first  start-up  or  after  critical  changes  before  restarting  it  has  to  be  checked  by 
expert. 

Review in the frame of the inspection test at least all four years by an expert.  .

Review by a qualified person at least once a year. 

 
How to carry out the overhead installation:
In tidal fall you should install the device out of the lounge ar
 
IMPORTANT! Overhead installation requires a high level of experience. This includes knowledge of 
calculating the payload, used installation material and safety inspections of the used material and the 
projector whereas the required experience
yourself under any circumstances if you are not qualified. Contact a professional installer. An 
inappropriate installation can lead to injuries and/or damaged properties. 
 
It is not allowed to install the device in the grip area of people.
 
If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory. 
The device may not be installed so it can swing freely in the room. 
 
Please note: Crashing down items can ca
the safety of a possible installation form!
 
Before installation make sure that the mounting surface has the ability to carry the tenfold point load of 
the own weight of the device. 
 
Mount the device with the mounting
 
During overhead installation the device must be always secured by a safety rope which is designed to 
hold the twelvefold weight of device. Only safety ropes with quick
may be used. Hang up the safety rope in the hole of the mounting bracket. Direct the rope over the 

5 / 8 

Overhead installation 

Danger of life! 
You have to observe the regulations of BGV C1 (formerly VBG 70) and 

17 Installations are to carry out by skilled personnel only.

The suspension devices have to be build and measured so they can withstand for an hour the tenfold 
of the payload without suffering a permanent detrimental deformation. 

Basically installation has to be made by using a second separate suspension. This can 
suitable net. The second suspension must be designed and attached so no part of the installation can 

During construction, reconstruction and deconstruction unnecessary stay in the range of moving 

bridges, under elevated work stations or any other danger zones is forbidden. 

The operator is obliged to following safety-related and mechanical facilities:  

up  or  after  critical  changes  before  restarting  it  has  to  be  checked  by 

Review in the frame of the inspection test at least all four years by an expert.  .
Review by a qualified person at least once a year.  

How to carry out the overhead installation: 
In tidal fall you should install the device out of the lounge area of people 

Overhead installation requires a high level of experience. This includes knowledge of 

calculating the payload, used installation material and safety inspections of the used material and the 
projector whereas the required experience is not limited to this. Do not try to carry out installation 
yourself under any circumstances if you are not qualified. Contact a professional installer. An 
inappropriate installation can lead to injuries and/or damaged properties.  

install the device in the grip area of people. 

If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory. 
The device may not be installed so it can swing freely in the room.  

Please note: Crashing down items can cause serious injuries! Do not install the projector, if you doubt 
the safety of a possible installation form! 

Before installation make sure that the mounting surface has the ability to carry the tenfold point load of 

e device with the mounting-bracket to your trussing system using an appropriate clamp. 

During overhead installation the device must be always secured by a safety rope which is designed to 
hold the twelvefold weight of device. Only safety ropes with quick-release safety fastener elements 
may be used. Hang up the safety rope in the hole of the mounting bracket. Direct the rope over the 

You have to observe the regulations of BGV C1 (formerly VBG 70) and 

Installations are to carry out by skilled personnel only. 

The suspension devices have to be build and measured so they can withstand for an hour the tenfold 

Basically installation has to be made by using a second separate suspension. This can be e.g. a 
suitable net. The second suspension must be designed and attached so no part of the installation can 

During construction, reconstruction and deconstruction unnecessary stay in the range of moving 

bridges, under elevated work stations or any other danger zones is forbidden.  

up  or  after  critical  changes  before  restarting  it  has  to  be  checked  by  an 

Review in the frame of the inspection test at least all four years by an expert.  . 

Overhead installation requires a high level of experience. This includes knowledge of 

calculating the payload, used installation material and safety inspections of the used material and the 

is not limited to this. Do not try to carry out installation 

yourself under any circumstances if you are not qualified. Contact a professional installer. An 

If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory. 

use serious injuries! Do not install the projector, if you doubt 

Before installation make sure that the mounting surface has the ability to carry the tenfold point load of 

bracket to your trussing system using an appropriate clamp.  

During overhead installation the device must be always secured by a safety rope which is designed to 

release safety fastener elements 

may be used. Hang up the safety rope in the hole of the mounting bracket. Direct the rope over the 

Summary of Contents for SL-5A

Page 1: ...Manual Speaker SL 5A 1pair SL 5A ...

Page 2: ...2 8 Table of contents 1 Safety instructions 3 1 1 For safe and efficient operation 3 2 Designated use 4 2 1 Overhead installation 5 3 Introduction 6 3 1 Product overview 6 4 Control 7 5 Technical data 7 ...

Page 3: ...lectric shocks Make sure to unplug the power supply before opening the housing For safe and efficient operation Be careful with heat and extreme temperature Avoid exposing it to direct rays of the sun or near a heating appliance Not put it in a temperature bellow 32 F 0 C or exceeding 104 F 40 C Keep away from humidity water and dust Do not place the set in a location with high humidity or lots of...

Page 4: ...stance of at least 0 5m between this device and the fog machine Make sure that the saturation of the fog has to enable a visibility of at least 10m Operate the device not during thunderstorms Surge voltages could destroy the device Unplug the power supply during thunderstorms Surrounding objects or surfaces should not be in contact with the device Make familiar yourself with the functions of the d...

Page 5: ...fore restarting it has to be checked by Review in the frame of the inspection test at least all four years by an expert Review by a qualified person at least once a year How to carry out the overhead installation In tidal fall you should install the device out of the lounge area of people Overhead installation requires a high level of experience This includes knowledge of calculating the payload u...

Page 6: ...ed furthermore Adjust the desired inclination angle via the mounting bracket and tighten the screw 3 Introduction Thank you for buying the Speaker SL 5A 1pair It is a powerful device For a successful installation and operation please read this manual carefully 3 1 Product overview 1 VOLUME Volume control for both speakers 2 TREBLE Raise or lower the trebles 3 BASS Raise or lower the bass 4 ON OFF ...

Page 7: ...distortions can be heard either amplifier or speakers are overloaded Overloads can be quickly caused to damages of amplifier or speaker 4 After usage set VOLUME TREBLE and BASS controls to the left stop position then turn off power switch 5 Technical data Frequency Frequency response 20 Hz 20 kHz Sensitivity SPL max 89 dB Components Transducer MF 5 25 Transducer HF 1 Technical data Capacity 30 W T...

Page 8: ...8 8 Importer B K Braun GmbH Industriestraße 2 D 76307 Karlsbad www bkbraun com info bkbraun com ...

Reviews: