
6
3. Power Connection and Grounding:
(1).
Connection method of power supply cable:
(2).
When the configuration of the power supply system is three-phase, four-wire 380V,
the connection method in order to supply single-phase 220 V to the product is as
follows.
The green/ yellow wire is the ground wire. System grounding works must be done properly.
Please contact qualified electrical engineering personnel to perform the works.
Caution:
If the system configuration does not have a
【
neutral (point) line
】
, the single-phase 220V servo motor
is not suitable for use in this place. Please reorder the three-phase 380V servo motor model from
the original supplier.
Single Phase
Connection
Brown wire
Blue wire
Green/Yellow wire
R
S
T
N
PE
Grounding system
G G G
1
ψ
220V
Motor
1
ψ
220V
Motor
1
ψ
220V
Motor
L1 L1 L1
L2
L2
L2
Neutral (point) line
Caution: Configuration of neutral (point) line is necessary
380 V
380 V
220 V
220 V
220 V
380 V
Summary of Contents for 700KS
Page 1: ...700KS KST VC008 CE VC008A B CE ELECTRONIC CONTROL PARAMETER MANUAL...
Page 6: ...2 b 1 3 1 2 3 4 1 4 1 2 5 3 4 5 1 5 1 2 3 4 1 6 1 7 18...
Page 7: ...3 F E B A D C 2 1 M5 1 1 2 A B 3 set C set D 4 M5 E 5 F 1 1 2 3 A set D...
Page 8: ...4 2 3 4 a 100 mm b TD c 100 mm a b 1 2 3 A A B B D D 60mm 247 5mm 175 6mm 232 6mm A B C D...
Page 10: ...6 3 220 V 220V R S T 5 R S T...
Page 11: ...7 4 1 2 12V LED IoT...
Page 12: ...8 5 LED 1 2 A A 01 46 a P A 01 b P 05 c S d P e S LED...
Page 13: ...9 3 B B 47 122 a b P B 47 c P 78 d S e P f S 1 S 2...
Page 14: ...10 4 A B 5 P 01 A 01 45 50 5 4 5 a b c A 01 01 46 B 47 47 122 d P 01 e S 45 f P g S h...
Page 15: ...11 B 01 45 4500 4000 5 4 5 a b c d P 01 e S 45 f P 40 g S h...