63 98 536 D 3439
D 3439
.
201.06.10
.
02 10.2017
35
Dentsply Sirona
5 Installation and startup
Operating Instructions CEREC MC XL Premium Package
5.5 Repacking
båÖäáëÜ
Switching the unit off
✔
The unit has finished the machining operation.
➢ Briefly press the ON/OFF button on the front panel.
When you let go of the button, the unit switches off.
5.5
Repacking
✔
The water tank is empty.
✔
The main switch on the back side of the unit is set to the 0 (OFF)
position.
1. Disconnect the power cable and the connecting cable from the back
side of the unit and stow them away.
2. Stow away the calibration tools in the drawer.
3. Check the unit for completeness according to the scope of supply!
4. Pack the unit securely.
5.6
Scope of supply
The detailed scope of supply is specified in the document "Checklist
CEREC MC XL Premium Package".
5.7
Storage
Store the unit in a closed and dry room at a temperature of -10°C to 50°C
for a maximum period of 12 months.
NOTICE
Repack only drained units!
Drain the unit! See "Removing water from the unit [ → 67]“.
NOTICE
Repack only drained units!
Drain the unit! See "Removing water from the unit [ → 67]“.
Summary of Contents for CEREC MC XL Premium Package
Page 77: ......