Siqura SA PTZ Series Installation Manual Download Page 5

 

5

 of 

7

 | 

P a g e

 

 

 

 

Connection board

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Field installation 
ID 

Name 

Notes 

M1 

Supply voltage 

Depending on model: 24VAC (max current: 6A) or 230VAC 50/60Hz (max current: 0,75A).  

PE (Protection Earth) must be connected.

 

M7 

Auxiliary AC output 

Designed  to  activate  washer  systems.  Generally  activated  via  AUX  2  in  Pelco  D.  The 
activation lasts 5 seconds. 

CN2 

Ethernet 

100base-TX fast Ethernet connection 

 

Pre- or not connected (Not to be changed) 
ID 

Name 

Notes 

M3 

Supply voltage 

Supply voltage for telemetry receiver and any 24VAC device inside the unit. 

M4 

Data input (RS485) 

Reserved.  (Pelco D Protocol to control telemetry receivers: 2400,N,8,1). 

M5 

RS485 bus 

Communication bus (RS485) for telemetry receiver. This provides the auxiliary DC output 
(M7). 

M6 

Auxiliary DC output  Reserved. (12 VDC. Max: 0,4A. Any connection of this Aux must be performed inside the 

base junction box.) 

M8 

Auxiliary AC output 

Auxiliary AC output connected to AUX 2 of telemetry receiver. 

M9 

Auxiliary data 
(RS485) 

Reserved. 

M10 

Auxiliary digital 
input 

Reserved: (Dry contact or open collector auxiliary input. Close IN1 (Collector) to Com IN 
(Emitter) to activate AUX1 (wiper). Close IN2 (Collector) to Com IN (Emitter) to activate 
AUX2 (washer). Com IN=GND.) 

CN1 

Ethernet 

Fast Ethernet to IP camera 

CH1_IN 

Analog input 

Reserved 

CH1_OUT  Analog output 

Reserved 

CN3 

Auxiliary connector 

Reserved 

CN4 

Same as above 

Reserved 

 
 
 

Reviews: