![Siqura FD12 Installation And Operation Manual Download Page 19](http://html1.mh-extra.com/html/siqura/fd12/fd12_installation-and-operation-manual_1283973019.webp)
15
Installation
9.
Attach the snap-on module into the dome housing.
please note
The terminal block should face the side
conduit entry, as shown in the figure.
10.
Connect the power and video outputs
Pan Adjustment
11.
After the dome body is mounted and the cables are
connected, the image should be displayed on the
monitor. Adjust the camera to a desired angle, as
shown in the three figures to the right.
Rotation Adjustment
Tilt Adjustment