|
Arterial Assembly Manual
Revision 1.0
Page
| 4
Side Panel Window Installation
Parts Involved
•
Side Panel Window
•
M4 x 10mm Fasteners x4
Pressure Testing
We strongly recommend pressure testing with an air pressure tester prior to filling your loop.
For pressure testing we recommend up to 8.7 PSI (0.6 bar).
Filling & Draining The Loop
Recommended Items
•
Air Pressure
Tester
•
External Power Supply for
D5 Pump
•
Long Fill Tube
Filling the Loop
To fill the loop, we strongly recommend a long fill tube. We use a 90-degree fitting with a barb
fitting and a 200mm length of soft tube. This prevents spilling and helps to remove the air faster.
Spectre Builds will usually take 1.2-1.5L of fluid but allow 2L.
We recommend air pressure testing before filling any loop. Air pressure should not surpass 0.6
bar.
Use an external PSU for your pump or jump start your PSU. Do not boot your system to fill the
loop.
Fill the reservoir 100% and run the pump until the reservoir is almost empty (do not run the pump
dry). Keep repeating until you have full circulation. Give some time for the final air to come out, it
can take 30min to 48hrs depending on your build. Keep the fill tube on until all the air is out and
then seal up the reservoir with a stop fitting.
Draining the Loop
There are various options for drain valves. No drainage system will ever drain a loop 100%. The
only way trapped coolant can be removed is the hard way in any build, dismantling the loop and
individually draining each section.
The side panel window is installed with x4 M4 x
10mm fasteners.
Summary of Contents for Arterial
Page 1: ...vv Revision 1 0 ...