5.3  Synoptic panel  

A synoptic panel is located on the front of the energy station. This is used to visualize the various alarms, the state of functioning 
and the measurements. It provides immediate signals, either illuminated or acoustic, which illustrate the general condition of the 
machine and more detailed information, including various measurements, which the operator can consult by using the keyboard 
and the display. 
 

5.4 Acoustic signal  

The acoustic alarm activates in case there is an electricity shortage and/or any other operation irregularity should occur.  Any key 
pressed silent the buzzer. 
 

5.5 Monitor Display 

The energy station indicates its state of functioning through various illuminated signals. In reference to figure F1, the signals 
illuminated by led diodes are indicated in Chart : 
 

LED  

MESSAGE 

MEANING 

 
GREEN LED 

 

 “PLANT FEED” 

On with Plant is powered. 
Off with Plant isn’t powered. 

RED LED 

 

“BATTERY MODE” 

On with line shortage. 
Off with line present. 

RED LED 

 

 “ALARM” 

Usually off.  
On for signaling generic alarm. 

 

5.6  Alarm contact  

The functioning alarm signals are isolated through relay free contacts  available  with the indications shown on chart : 
 

RELAY FREE CONTACTS 

OPEN 

CLOSE 

“CN1” 

Plant feed 

1-3 1-2 

“CN2” 

Battery mode 

4-6 4-5 

“CN3” 

Battery Low 

7-9 7-8 

“CN4” 

Alarm  

10-12 10-11 

 
When running and in normal functioning condition, contacts  “CN1” – “CN3”  – “CN4” are  OPEN 
 

5.7 PROTECTION ELEMENTS 

 
The energy station, SCS2ENMD48, is provided with the following protection:

 

 

  Output fuses breaker towards the loads are positioned on the front panel of the SCS2ENMD48. If one of this 

opens in case of over-current absorption  an alarm is generated. This alarm is displayed and set the 
corresponding alarm relè. 

  The AC input fuses are positioned on the front panel of the system together the breaker of the loads and the 

battery;  

  Output low battery voltage to save battery life (43Vdc ± 2%); 

  Output current limitation. 

  Output over voltage protection (Vout > 57 Vdc); 

 

 Overheating 

protection;

 

 
Thanks to the presence of this protections, it is not necessary to install other types of line protection on the 
telecommunication plants which are supplied by the energy station SCS2ENMD48. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for SCS2ENMD48.3x30

Page 1: ... Input 230 Vac Output 48 Vdc 90 A Sinercom S r l Headquarter Via G Cappalonga 9 A 00043 Ciampino RM Italy tel 39 06 79800323 fax 39 06 79814644 Factory Via Cascina Secchi 247 4b 24040 Isso BG Italy tel 39 0363 938231 fax 39 0363 998235 USER MANUAL ...

Page 2: ...CHING ON 9 5 5 SWITCHING OFF 9 6 0 FUNCTIONING 10 6 1 OPERATIVE ELEMENTS 10 6 2 ACOUSTIC SIGNALS 10 6 3 LED INDICATORS 10 6 4 TELE ALARM SIGNALS 11 6 5 DISPLAY FOR LOCAL DIAGNOSTIC 11 6 5 1 Battery Test 12 6 5 2 Alarm Message 13 6 6 FUNCTIONAL PARAMETER PROGRAMMING 13 6 6 1 Past Messages 13 6 6 2 Date And Time Setting 13 6 6 3 Assistance 14 F1 FIGURA 1 OVERALL VIEW 5 F2 FIGURA 2 OPERATIVE ELEMENTS...

Page 3: ...ectrical and electronic products In the case of circuit parts which are subject to dangerous tensions they are identified by specific labels as indicated in the EN 60950 normative Any intervention on these circuits carried out by non expert technicians is dangerous 1 3 2 FIRE RISKS The parts which make up the device do not have a specific point of applicable or definite flammability The basic prod...

Page 4: ...ergy station may be made directly on site Rectifier uses forced cooling to dissipate the heat produced by the electronic power components The SCS2ENMD48 is engineered using advanced technology A high frequency push pull converter topology is used in this model Power is transferred to the load via a transformer therefore output voltage returns are DC isolated from input AC returns An inductor and c...

Page 5: ...IGNALINGS Signal LED Plant powered Battery mode Alarm Views Display LCD 16 x 2 Line Output voltage Input AC voltage Load current Battery charging Current Battery test Date Time Historical menù Setup Service Dry contacts alarm NO or NC Plant powered Battery mode Battery low Alarms OTHER REQUIREMENT Acoustic Noise No higher than 55dB A Cooling Forced air cooling Dimension L x W x H mm 437 x 430 x 17...

Page 6: ...ption Quantity Remarks Power system cabinet w monitor display SCS2MD48 Must 1 Rectifier module 30 A Must 1 or 2 or 3 Single rectifier max output is 1500W 5 2 Front and back view of the system Front view Figure1 Rear view Figure2 Rear DC Output Load Battery figure3 ...

Page 7: ...ARM Usually off On for signaling generic alarm 5 6 Alarm contact The functioning alarm signals are isolated through relay free contacts available with the indications shown on chart RELAY FREE CONTACTS OPEN CLOSE CN1 Plant feed 1 3 1 2 CN2 Battery mode 4 6 4 5 CN3 Battery Low 7 9 7 8 CN4 Alarm 10 12 10 11 When running and in normal functioning condition contacts CN1 CN3 CN4 are OPEN 5 7 PROTECTION...

Page 8: ...ry mode a relay disconnects the battery and the load if the voltage level it s fall below the 43Vdc level This is to prevent an excessive discharge of the battery Software information The microprocessor board together with analog and digital sensors controls all the electric parameters as voltages currents fuses and working temperature and their parameters visualized on the main lcd display When t...

Page 9: ...E Set the system date is important because is visualized on the historical menu DD MM YY Set by press P the HH blink change with and the time press P to confirm Continue with the mounth and year Press to exit DD day MM month YY year 3 2 SET HOUR Set the hour system HH MM SS Set by press P the HH blink change with and the time press P to confirm Continue with the minute and second Press to exit HH ...

Page 10: ... N Linea Trifase 400VAC 3F N NOTE The connection of the three phase line input is only possible with the 3 power supplies installed and operating 2 Switch on ENERGY by turning the switch to the I position to all modules the leds of the modules will light up and after few second the red led ALARM turns off and the LED green POWER remains access fixed At this point the energy station is turned on Th...

Page 11: ...d the display indicates BATTERY TEST TEST OK If instead the result of both tests is negative the display will read BATTERY TEST TEST FAILED Check the battery voltage if the value is XX wait one hour and make the test a second time If the test fails again replace the batteries 8 7 ERROR MESSAGE Below is a list of error messages that can be viewed from the synoptic panel Error Message Meaning SYSTEM...

Reviews: