![Sinclair SDV5 Series Service Manual Download Page 10](http://html1.mh-extra.com/html/sinclair/sdv5-series/sdv5-series_service-manual_1280231010.webp)
201805
7
Caution
All installation, servicing and maintenance must be carried out by competent and suitably qualified, certified
and accredited professionals and in accordance with all applicable legislation.
Units should be grounded in accordance with all applicable legislation. Metal and other conductive components
should be insulated in accordance with all applicable legislation.
Power supply wiring should be securely fastened at the power supply terminals – loose power supply wiring
would represent a fire risk.
After installation, servicing or maintenance, the electric control box cover should be closed. Failing to close the
electric control box cover risks fire or electric shock.
Switch ENC1 (indoor unit capacity setting) is factory-set and its setting should normally not be changed. The
only circumstances in which a switch ENC1 might need to be set in the field is when replacing a main PCB.
When replacing a main PCB, ensure that the capacity setting on switch ENC1 on the new PCB is consistent with
the unit capacity given on the unit’s nameplate.
Notes for installers and service engineers
Summary of Contents for SDV5 Series
Page 1: ...INDOOR FLOOR CEILING UNITS SDV5 xxFA C O M M E R C I A L A I R C O N D I T I O N E R S S D V 5...
Page 9: ...6 201805 5 Wiring Diagram Figure 5 1 Ceiling floor wiring diagram...
Page 22: ...FLOOR CEILING UNITS SDV5 36 140FA C O M M E R C I A L A I R C O N D I T I O N E R S S D V 5...
Page 23: ...SDV5 36FA...
Page 26: ...SDV5 45FA...
Page 29: ...SDV5 56FA...
Page 32: ...SDV5 71FA...
Page 35: ...SDV5 80FA...
Page 38: ...SDV5 90FA...
Page 41: ...SDV5 112FA...
Page 43: ...SDV5 140FA...