![Sinclair ASH-09AIE2 Service Manual Download Page 52](http://html.mh-extra.com/html/sinclair/ash-09aie2/ash-09aie2_service-manual_1280135052.webp)
48
Installation and Maintenance
Service Manual
(6) Overload and air exhaust malfunction diagnosis (following AP1 for outdoor unit control board)
Mainly detect:
●Is the PMV connected well or not? Is PMV damaged?
●Is refrigerant leaked?
Fault diagnosis process:
20 minutes after the
complete unit is
powered off
Is the terminal FA for the
electronic expansion valve
connected correctly?
Connect the
wires correctly
Resistances between the first four pins
close to the terminal hole and the fifth
pin are almost the same, less than 100
ohm.
Replace the electronic
expansion valve
If the fault is eliminated?
If the fault is eliminated?
Replace the
control panel
AP1
Coolant leakage, refilling
the coolant
End
No
No
No
Yes
Yes
Yes
Summary of Contents for ASH-09AIE2
Page 1: ...SERVICE MANUAL ASH 09AIE2 ASH 12AIE2 ELEMENT SERIE ...
Page 2: ......
Page 17: ...13 Technical Information Service Manual no display ...
Page 18: ...14 Technical Information Service Manual ...
Page 19: ...15 Technical Information Service Manual battery Cover of battery box remove reinstall ...
Page 60: ...56 Installation and Maintenance Service Manual 10 2 Outdoor Unit ...