The  boiler  must  be  installed  in  a  fixed  loca-

tion  and  only  by  specialized  and  qualified

firms  in  compliance  with  all  instructions

contained in this manual. 

Furthermore,  the  installation  must  be  in

accordance  with  current  standards  and

regulations.

2.1

BOILER ROOM

The boilers can be installed in any domestic

environment  without  any  location  restric-

tions or comburent air requirements.

2.3

BOILER SUPPORT BRACKET

For the mounting of the support bracket of

the boiler, which is supplied, observe the fol-

lowing instructions (fig. 4):

–Fix  the  bracket  to  the  wall  with  appro-

priate dowels.

–Check with a spirit level that it is perfec-

tly in horizontal plane.

2.3.1

Installation plate (optional)

The installation plate code 8081216 is sup-

plied with an instruction sheet for the fixing.

2.3.2

System connection unions

The following optional accessories are avail-

able to facilitate water and gas connection

of the boiler with the heating system: 

–curve kit, code 8075423

–cock kit, code 8091809

Detailed  instructions  for  assembly  of  the

unions are provided with the kits. 

2.3.3

Flow regulator

At  the  inlet  of  the  hot  water  a  flow  regula-

tor  brown  is  installed,  from  12  l/  min  (fig.

5).

2.4

CONNECTING UP SYSTEM

To protect the heat system from damaging

corrosion,  incrustation  or  deposits,  after

installation  it  is  extremely  impor tant  to

clean  the  system  using  suitable  products

such  as,  for  example,  Sentinel  X300  or

X400. 

Complete  instructions  are  provided  with

the  products  but,  for  further  information,

you may directly contact GE Betz.

For  long-term  protection  agains  corrosion

and  deposits,  the  use  of  inhibitors  such  as

Sentinel  X100  is  recommended  after  clea-

ning the system. 

It  is  important  to  check  the  concentration

of the inhibitor after each system modifica-

tion  and  during  maintenance  following  the

manufacturer’s  instructions  (specific  tests

are available at your dealer).  

The  safety  valve  drain  must  be  connected

to a collection funnel to collect any dischar-

ge  during  int er ventions.  If  the  heating

system  is  on  a  higher  floor  than  the  boiler,

install  the  on/off  taps  supplied  in  kit  code

8 0 918 0 9   o n   t h e   h e a t i n g   s y s t e m

delivery/return pipes.

WARNING: 

Failure  to  clean  the  heat  system  or  add

an adequate inhibitor invalidates the devi-

ce’s warranty.

Gas  connections  must  be  made  in  accor-

dance  with  current  standards  and  regula-

tions.  When  dimensioning  gas  pipes  from

the  meter  to  the  module,  both  capacity

volume  (consumption)  in  m

3

/h  and  gas

density must be taken into account. 

The  sections  of  the  piping  making  up  the

system  must  be  such  as  to  guarantee  a

supply  of  gas  sufficient  to  cover  the  maxi-

mum  demand,  limiting  pressure  loss

between the gas meter and any apparatus

being used to not greater than:

–1.0 mbar for family II gases (natural gas);

–2.0  mbar  for  family  III  gases  (butane  or

propane).

An adhesive data plate is sticked inside the

front panel; it contains all the technical data

identifying the boiler and the type of gas for

which the boiler is arranged.

2.4.1

Connection of condensation 

water trap

The drip board and its water trap must be

connected  to  a  civil  drain  through  a  pipe

with a slope of at least 5 mm per metre to

ensure drainage of condensation water. 

The  plastic  pipes  normally  used  for  civil

drains  are  the  only  type  of  pipe  which  is

appropriate  for  conveying  condensation

to the building’s sewer pipes.

2.4.2

Filter on the gas pipe

The  gas  valve  is  supplied  ex  factory  with  an

inlet filter, which, however, is not adequate to

entrap all the impurities in the gas or in gas

main pipes. To prevent malfunctioning of the

valve, or in certain cases even to cut out the

safety  device  with  which  the  valve  is  equip-

ped, install an adequate filter on the gas pipe.

2.5

SYSTEM FILLING

The boiler and the heating system are filled

with water using the fill cock (fig. 6).

The charge pressure, with the system cold,

must be 

1 bar

Filling  must  be  done  slowly  so  as  to  allow

any air bubbles to be bled off through the air

valves.

2

INSTALLATION

Fig. 4

Fig. 5

CLOSE

Fig. 6

91

IT

ES

PT

GB

Summary of Contents for PLANET DEWY 30 BF

Page 1: ...is unobstructed and has been properly installed Make sure that any shutoff valves are open Make sure that the system is charged with water and is thoroughly vented Check that the circulating pump is not locked CAUTION Remember to release the pump coupled with the control panel if necessary to protect the electronic control card Purge the system bleeding off the air present in the gas pipe by opera...

Page 2: ...e fuelled by natural gas methane gas or propane G31 The instructions given in this manual are provided to ensure proper installation and perfect operation of the appliance 1 DESCRIPTION OF THE BOILER 1 2 DIMENSIONS 100 152 70100 78 E U M R G 110 79 S3 C 156 90 865 600 ø 60 100 222 450 460 934 297 22 850 5 Fig 1 CONNECTIONS R C H return G 3 4 UNI ISO 228 1 M C H flow G 3 4 UNI ISO 228 1 G Gas conne...

Page 3: ...d power consumption W 160 Electrical protection grade IP X4D CE certification n 1312BP4098 Category II2H3P Type B23 53 C13 33 43 53 83 C H Maximum water head bar 3 Maximum temperature C 85 Water content boiler l 10 0 C H setting range C 20 80 Expansion vessel capacity l 10 Expansion vessel pressure bar 1 Gas consumption nominal minimum G20 m3 h 3 17 0 84 Gas consumption nominal minimum G31 kg h 2 ...

Page 4: ...m delivery cock optional 21 Incoming tap water cock 22 Hot water tank drain cock 23 Hot water probe SB 24 Limit thermostat 85 C 25 Magnesium anode 26 Assembly template optional 27 Manual filling unit 28 One way valve 29 Condensation drain trap 30 Flow switch 31 Air bleed valve LEGEND 1 Control panel 2 Heating system circulator 3 Hot water circulator 4 One way valve 5 Heating system safety valve 6 ...

Page 5: ...t be connected to a collection funnel to collect any dischar ge during interventions If the heating system is on a higher floor than the boiler install the on off taps supplied in kit code 8091809 on the heating system delivery return pipes WARNING Failure to clean the heat system or add an adequate inhibitor invalidates the devi ce s warranty Gas connections must be made in accor dance with curre...

Page 6: ...tlet Both ducts may be oriented in any direction Refer to fig 9 for positioning The maximum overall length of the intake and exhaust ducts depends on the head losses of the single fittings installed excluding the doublers and must not be greater than 13 mm H2O For head losses in the fittings refer to Table 2 Fig 7 KEY 1a b Coaxial duct kit code 8096250 2a Extension L 1000 code 8096150 2b Extension...

Page 7: ...7 m horizontal pipe ø 80 x 0 20 1 40 7 m horizontal pipe ø 80 x 0 40 2 80 n 2 90 elbows ø 80 x 0 30 0 60 n 2 90 elbows ø 80 x 0 50 1 00 N 1 terminal ø 80 0 10 0 40 Total head loss 2 10 4 20 6 3 mm H2O TABLE 2 Accessories ø 80 Total head loss mm H2O PLANET DEWY 30 50 BF model Inlet Outlet Roof outlet 90 elbow MF 0 30 0 50 45 elbow MF 0 20 0 40 Extension L 1000 horizontal 0 20 0 40 Extension L 1000 ...

Page 8: ...or the pipes must not exceed 13 mm H2O When calculating the lengths of pipe take into account the parameters given in the Table 2 Fig 12 KEY 1 Separate pipes kit code 8089911 2 90 elbow MF 6 pz code 8077450 3 90 elbow MF with take off points code 8077452 4 a Extension L 1000 6 pz code 8077351 4 b Extension L 500 6 pz code 8077350 6 Int est ring kit code 8091500 7 Inlet terminal code 8089500 9 Doub...

Page 9: ...elow eaves 300 D below balcony 1 300 E from adjacent window 400 F from adjacent ventilation opening 600 G from horizontal or vertical soil or drain pipes 2 300 H from corner of building 300 I from recess in building 300 L from ground level or other treadable surface 2500 M between two terminals set vertically 1500 N between two terminals set horizontally 1000 O from a surface facing without openin...

Page 10: ...rt the equipment which will start up as soon as it receives current To gain access to connector 3 remove the control panel cover and connect the climate regulator to terminals CR 6 7 WARNING External voltage must not be connected to terminals 1 2 3 4 of the Logica Remote Control A telephone remote switch with a zero potential contact or a window contact can be connected to terminals 3 4 Equipment ...

Page 11: ... sensor optional cod 8094100 TA Room stat SM C H sensor TL Limit stat TRA Ignition transformer TR Transformer 230 24V FL Flowmeter SB D H W sensor CR Logica Remote Control optional cod 8092204 SV Ventilator board OP Time programmer TF Smoke stat PB Heating system pump Note The room stat TA must be connected to the terminals 5 6 CONNECTOR SPARE PART CODES J2 code 6278613 J3 code 6278660 J4 code 627...

Page 12: ...t or through a window contact Anti bacterial 2 10 1 Installation The unit must be installed in the main living room For installation follow the assembly instructions inserted in the package At this point with the selector knob on the installer can adjust the basic parameters set tings according to the individual needs point 2 10 2 If there is a thermostatic radiator valve fitted this must be set t...

Page 13: ... per minute of the prescribed delivery temperature value sent in C is limited to the imposed value With the activation of the adaptation the pre set value transmitted to the boiler regulator is adapted to the effective heat need The adaptation functions with both the atmospheric guide with ambient influence and with pure ambient control If the Logica Remote Control is set as a remote control only ...

Page 14: ...na quando o parâmetro 64 1 0 activa só a sonda interna 0 externa 100 interna 50 valor médio da sonda externa interna 100 activa só a sonda externa Para a regulação ambiente e a visualização é utilizada a mistura programa da Se a sonda externa apresenta um curto circuito ou uma interrupção prossegue se com a sonda interna This function allows the hot water to be brought to a high temperature once a...

Page 15: ...mer must be regulated so as to obtain a pressure of approx 3 mbar at the burner for methane gas and 7 mbar for propane gas G31 To increase pressure turn the trimmer clockwise to reduce pres sure turn the trimmer counterclockwi se The slow ignition pressure level can be set during the first 3 seconds fol lowing burner ignition After setting the pressure level upon ignition STEP according to the typ...

Page 16: ...ve opens at the same time The burner must be ignited within 10 seconds However it is possible for ignition failures to occur with conse quent activation of signal indicating that the control box has locked out Gas failure The control box runs through the cycle normally sending electric power to the ignition electrode The electrode conti nues spark discharge for a maximum of 10 sec If the burner do...

Page 17: ...the burner if the boiler is without water due to the formation of an air lock in the heat exchanger or if the circulator is not working or because the Aqua Guard filter is obstructed with impu rities NOTE If replacing the flow switch valve make sure that the arrow stamped on the valve points in the same direction as the flow of water 3 6 MAINS ELECTRICITY CONNECTION Use a separate electricity supp...

Page 18: ...at the factory which is approximately 17 kW use a screwdriver to adjust the heating heat out put trimmer 8 fig 23 To increase working pressure turn the trim mer clockwise to reduce pressure turn the trimmer counterclockwise To determine boiler heat output setting check energy consumption by observing the meter and then compare with the values shown in Table 4 or checked with a digital pressure gau...

Page 19: ...ure in mmH2O shown in the table 4 Close the gas capacity step 5 Drawing 6 to obtain the value in mmH2O shown in the table 5 Turn on a hot water tap to bring the boiler up to maxi mum hot water power 6 Calibrate the maximum gas pressure using the gas capacity step 5 Drawing 6 to obtain the figure in mmH2O shown in the table After completion of calibration operations check CO2 values using a combust...

Page 20: ...tioning in heating mode at the maximum power with switching off at 80 C and restarting at 70 C Before activating the chimney sweep func tion make sure that the radiator valves or eventual zone valves are open The test may be carried out also during hot water functioning To do so it is enough after having activated the chimney sweep function to take some hot water from one or more taps after a few ...

Page 21: ... unit maintenan ce temperature will appear on the red led scale 35 80 C The C H temperature can be adjusted by turning the knob of the C H potentio meter The set temperature is indi cated on the red led scale from 35 80 C and the yellow heating led lights up at the same time If the temperature of the C H return water is lower than around 55 C con densation of the combustion by products is obtained...

Page 22: ...gnite the red led will light up To attempt a boiler restart rotate the selector knob to position and relea se it immediately placing it in the sum mer or winter operation posi tion If the boiler lock out re occurs contact an authorised Service Centre Insufficient water pressure fig 4 If the red 0 5 bar led starts flashing the boiler will not function To restart operation rotate the charge valve an...

Page 23: ...ave any effect and all of the func tions will be managed by the regulator fig 7 If the Logica Remote Control breaks down the boiler will function by placing the selector on the o position obviou sly without consequent control of the room temperature No interior da tampa estão indicadas as instruções de funcionamento fig 8 Cada programação ou modificação é visualizada e confirmada no display fig 9 ...

Page 24: ... the fol lowing list of items one after the other are displayed The thermo feeler continues to function independently of the display Day hour room temperature External temperature Hot water service temperature This data appear only if the relative feeler is connected or if they are transmitted by the regulator of the boiler Info key reference key grey colour The operating mode desired is selected ...

Page 25: ...e capacity boiler unit temperature desired for hot water service at reduced level To have access to the reduced hot water service temperature parameter press the and keys at the same time for at least 5 seconds and then go along the entered lines with the key until parameter 61 is reached Regulate the value with and Before proceeding with the adjustment in the temperature on the regulator the ther...

Page 26: ...e temperature set in parameter 3 1 standard Hot water according to the daily heating programme In the comfort periods of the heating the temperature of the boiler unit is regulated at the value set via para meter 61 2 sservice suspended 3 second daily programme 8 Everyday of the week the temperature of the hot water ser vice is set according to programme B In this case the programming is one for a...

Page 27: ... the set days have elapsed the regulator will go on to the automatic function NOTE The vacation period may be cancelled by pressing a key of the operating mode Current values Display and setting of the gradient of the heating characteristics curve When the room temperature set is not reached choose the gradient indicated in point 2 11 3 Display of the current boiler temperature Display of the curr...

Page 28: ...ntilator malfunction Call an authorised Service Centre No communication between the Logica Remote Control and the boiler Call an authorised Service Centre 1 0 Error display Ignition lock out Rotate selector CR OFF EST INV RESET on the boiler control panel to the release position to reset operation fig 3 If the lock out re occurs call an authorised Service Centre Safety thermostat trip Rotate selec...

Page 29: ...iche tecniche e funzionali alle prescrizioni delle norme UNI CIG 7271 aprile 1988 UNI CIG 9893 dicembre 1991 UNI EN 297 per APPARECCHI A GAS DI TIPO B AVENTI PORTATA TERMICA 70 kW EN 483 per APPARECCHI A GAS DI TIPO C AVENTI PORTATA TERMICA 70 kW La portata al sanitario delle caldaie combinate è rispondente alla norma UNI EN 625 per APPARECCHI AVENTI PORTATA TERMICA 70 kW Le caldaie a gas sono ino...

Page 30: ... 0 FORMAT 30 60 BF 29 5 31 6 86 9 93 5 84 4 92 0 FORMAT zip 25 OF METRÒ zip 25 OF 23 5 25 8 86 7 91 2 82 9 91 1 FORMAT zip 30 OF 28 8 31 6 86 9 91 1 83 9 90 0 FORMAT zip 25 BF METRÒ zip 25 BF 23 4 25 8 86 7 90 6 83 6 88 5 FORMAT zip 30 BF 28 8 31 6 86 9 91 0 83 9 89 4 FORMAT zip 35 BF 31 6 34 8 87 0 90 8 84 0 88 0 FORMAT zip 4 25 OF FORMAT zip 5 25 OF 23 5 25 8 86 7 91 2 82 9 91 1 FORMAT zip 4 25 ...

Page 31: ......

Page 32: ...Fonderie Sime S p A Via Garbo 27 37045 Legnago Vr Tel 39 0442 631111 Fax 39 0442 631292 www sime it Cod 6274237 Documentation Dpt ...

Reviews: