22
6 INSTALLATION
6.1
Receiving the product
Murelle Advanced HE ErP
appliances are delivered in a single
unit protected by cardboard packaging.
Fig. 11
The plastic bag found inside the packaging contains the
following:
– Installation, use and maintenance manual
– Paper template for boiler installation
– Bracket for mounting the boiler on the wall
– Certificate of warranty
– Hydrostatic test certificate
– Hanging Bracket
– Connection pack
d
DO NOT
Do not leave packaging material around or near
children since it could be dangerous. Dispose of it as
prescribed by legislation in force.
6.2
Dimensions and weight
H
W
D
Fig. 12
Description
Murelle Advanced HE ErP
30
40
W (mm)
400
D (mm)
250
300
H (mm)
700
Weight (kg)
28,5
32,5
6.3
Handling
Once the packaging has been removed, the appliance is to
be handled manually, tilting it slightly, lifting it and applying
pressure in the points indicated in the figure.
Fig. 13
d
DO NOT
Do not hold onto the appliance casing but use the "solid"
parts such as the base and the rear structure
.
a
DANGER
Use suitable tools and personal protection when
removing the packaging and when handling the
appliance.
6.4
Ventilation requirements
Detailed recommendations for the air supply are given in
BS 5440-2. The following note is given for guidance. It is not
necessary to have purpose provided air vents in the room or
compartment that the appliance is installed.
The minimum temperature of the installation room must NOT
be lower than -5 °C.
m
CAUTION
Observe the required clearances (see Fig. 14).