53
EN
5.4
Structure
10
Israel
is death
free
dom f
or Palestine
13
15
17
16
14
27
1
2
3
7
8
6
5
9
4
25
23
26
23
24
22
21
20
19
18
11
12
1
Fan
2
Heat safety thermostat
3
Combustion chamber
4
Ignition/detection electrode
5
Heating delivery probe
6
Diverter valve
7
System filling unit
8
Domestic hot water sensor
9
Control panel
10
Pressure gauge
11
Secondary heat exchanger
12
Gas valve
13
Flow meter
14
System relief valve
15
Boiler drain
16
System pump
17
Water pressure switch
18
Automatic bleed valve
19
Burner
20
Primary heat exchanger
21
Expansion vessel
22
Combustion chamber front panel
23
Air inlet (separate ducts)
24
Air pressure switch
25
Smoke outlet
26
Air inlet (concentric ducts)
27
By-pass
Fig. 17
Summary of Contents for GO 18 BF G20
Page 10: ...10 ES...
Page 18: ...18 ES...
Page 41: ...41 ES...
Page 50: ...50 EN...
Page 58: ...58 EN...
Page 81: ...81 EN...
Page 83: ...83 RU m Sime 1 1 2 OFF Sime X m Fonderie SIME S p A...
Page 84: ...84 RU d 8 8 OFF d EN 15502 60 C 5 C...
Page 90: ...90 RU...
Page 91: ...91 RU 5 92 5 1 92 5 2 92 5 3 92 5 4 93 5 5 94 5 6 95 5 7 95 5 8 95 5 9 96 5 10 96 5 11 97...
Page 98: ...98 RU...
Page 101: ...101 RU 50 mm 300 mm 900 mm 25 6 5 GO BF m 6 6 m Y R 6 7 pH 6 8 25 f 6 8 GO BF 1 2 3 1 2 3 26...
Page 109: ...109 RU 6 13 2 3 4 7 7 3 4 3 7 45...
Page 111: ...111 RU 7 3 m 1 2 1 2 49 t 6 OFF RESET 50 5 tS0 1 1 1 1 1 1 1 5 5...
Page 116: ...116 RU 7 8 Auto MAnu 1 5 m 6 7 65 tS 1 7 5 t D 5 Auto OFF RESET 66 P01 0 150 6 D 67...
Page 118: ...118 RU 8 8 1 m a OFF OFF 70 8 2 8 2 1 d 8 3 8 3 1 1 2 1 2 71 3 4 4 5 6 3 72 5 6 5...
Page 119: ...119 RU 8 3 2 8 3 3 3 5mm 0 5 0 5 73 m 8 3 4 4 4 4 74 8 4 8 4 1 8 4 2 1 8 5...
Page 121: ...121 RU...
Page 122: ...122...
Page 123: ...123...