background image

77

~5 s

~12 s

~12 s

0÷150 s

0÷150 s

2.7.3

“AQUA 30 OF/BF - AQUA 30 OF/BF INOX” functional diagram

Consensus for start-up

Heater stat

Heater

Motor

Ignition transform.

Gas-oil valve

Flame

Stop light

Normal

Stopped due to failure to ignite

~5 s

~12 s

~12 s

Consensus for start-up

Motor

Ignition transform.

Gas-oil valve

Flame

Stop light

2.7.4

“AQUA 40 OF/BF - AQUA 40 OF/BF INOX” functional diagram

Normal

Stopped due to failure to ignite

Summary of Contents for AQUA 30 BF INOX

Page 1: ...e materials in the immediate vicinity of the boiler Make sure that the electrical connections have been made correctly and that the earth wire is connected to a good earthing system Check that the flue pipe for the outlet of the products of the combustion is unobstructed Make sure that any shutoff valves are open Make sure that the system is charged with water and is thoroughly vented Check that t...

Page 2: ... installa tion and perfect operation of the appli ance and should be strictly followed 66 1 DESCRIPTION OF THE BOILER 1 2 DIMENSIONS 550 1430 A 850 70 215 1230 340 825 515 125 200 90 1075 1230 825 515 125 200 90 1075 215 70 340 U C E U C E 75 75 S1 M R S2 S1 M R S2 ø 8 0 1 2 5 ø 1 3 0 Versione BF Versione OF Fig 1 KEY M C H flow G 1 UNI ISO 228 1 R C H return G 1 UNI ISO 228 1 U D H W outlet G 3 4...

Page 3: ...12 5 12 5 Maximum temperature C 95 95 95 95 Power consumption OF BF W 200 230 180 210 200 230 180 210 Adjustment range heating C 45 85 45 85 45 85 45 85 Adjustment range D H W C 30 60 30 60 30 60 30 60 D H W production Tank capacity l 120 120 110 110 D H W flow rate EN625 l min 20 9 20 9 20 9 20 9 Contin D H W flow rate t 30 C l h 840 790 840 830 780 830 D H W expansion vessel l 4 4 4 4 D H W tank...

Page 4: ... drainer cock 3 120 litre tank 4 Tank pump 5 Control valve 6 Gas oil burner 7 Hublot 8 Bulb housing sheath 9 Control panel 10 Expansion vessel 11 System safety valve 3 BAR 12 Water switch 13 Air intake for airtight burner BF versions 14 Hydrometer 15 System pump 17 Filling 18 Tank safety valve 7 BAR 19 Tank expansion vessel 20 Magnesium anode ...

Page 5: ...l burner 2 Hublot 3 Filling 4 Tank pump 5 Control valve 6 Tank expansion vessel 7 Control panel 8 Expansion vessel 9 110 litre tank in inox 10 Bulb housing sheath 11 Water switch 12 System safety valve 3 BAR 13 Air intake for airtight burner BF versions 14 Hydrometer 15 System pump 16 Magnesium anode ...

Page 6: ...ve 9 Gas oil burner 10 Filling 11 Tank safety valve 12 Tank expansion vessel 14 Tank pump 15 Tank drainer cock 16 Boiler drainer cock 17 Magnesium anode 18 D H W probe 19 120 litre tank KEY 1 Boiler body 2 Hydrometer 3 Air relief valve 4 System pump 5 Tank pump 6 Control valve 7 Tank expansion vessel 8 Tank safety valve 9 Magnesium anode 10 Tank drainer cock 11 System expansion vessel 12 Boiler dr...

Page 7: ...n In order that the boiler be capable of supplying treated water all the air in the boiler s serpentine must be bled off at the first ignition This operation is made easy by positioning horizontal ly the incision of the block screw of the shutoff valve 5 fig 2 2 a After all the air has been bled off put the screw back to its original position 2 2 3 Characteristics of feedwater To prevent lime scal...

Page 8: ... indicated in Table A Only use original SIME accessories and make sure that connections are correct as indicated in the instruc tions supplied with the accessories 2 4 FUEL ADDUCTION The fuel can be fed into the thermal group sideways the ducts must be passed through the aperture on the 72 P S K H 1 2 3 4 2 5 6 7 7 3 3 ø 80 125 min 715 KEY 1 Stainless steel coaxial flue L 886 code 8096220 2a Stain...

Page 9: ... settings this should be done by authorised per sonnel following the instructions pro vided below Remove the shell door to access the burner unit s controls 2 5 1 Air lock adjustment To adjust the air lock loosen the screw 1 fig 8 and slide the graduated scale 2 fig 8 indicating the position air lock position The values for adjustment of each unit are given in point 1 3 2 5 2 Pump pressure adjustm...

Page 10: ... it is not required 2 7 ELECTRICAL CONNECTION The boiler is supplied with an electric cable and the electric power supply to the boiler must be 230V 50Hz single phase through a fused main switch The stat cable whose installation is compulsory for obtaining a better adjustment of the room temperature must be connected as shown in fig 9 9 a NOTE Device must be connected to an effi cient earthing sys...

Page 11: ...ressure gauge triggered light SA Power on light SB Burner lock out warning light PA Water switch PI C H pump PB Tank pump B Gas oil burner TA Room stat OP Timer programmer optional TI Anti thermal inertia thermostat NOTE When connecting the room stat TA remove the bridge between terminals 20 21 When connecting the Timer Programmer OP remove the bridge between terminals 30 31 ...

Page 12: ...urner lock out warning light PA Water switch PI C H pump PB Tank pump B Gas oil burner TA Room stat C RVA 43 222 control unit connectors optional SS Type QAZ21 boiler immersion probe optional SC Type QAZ21 boiler immersion probe optional SE Outdoor temperature probe QAC31 optional UA Type QAA70 room thermometer optional TI Anti thermal inertia thermostat NOTE When connecting the RV 43 222 unit rem...

Page 13: ...t up Heater stat Heater Motor Ignition transform Gas oil valve Flame Stop light Normal Stopped due to failure to ignite 5 s 12 s 12 s Consensus for start up Motor Ignition transform Gas oil valve Flame Stop light 2 7 4 AQUA 40 OF BF AQUA 40 OF BF INOX functional diagram Normal Stopped due to failure to ignite ...

Page 14: ... cally stop working as soon as the boiler temperature falls below 90 C 4 1 RVA 43 222 UNIT optional The control panel allows the use della centralina RVA 43 222 supplied in kit form upon request complete with mounting instructions fig 12 Make the electric connection as shown in point 2 7 4 2 TANK MAINTENANCE The preparation of hot treated water is guaranteed by a heater in INOX AISI 316L complete ...

Page 15: ...N VESSEL The heating expansion tank is disas sembled in the following manner Make sure that the boiler has been emptied of water Unscrew the union which connects the expansion tank Remove the expansion tank Before filling up the system make sure that the expansion tank is reloaded at the pressure of 0 8 1 bar 3 8 4 1 2 7 5 6 7 8 3 9 4 1 6 5 2 Fig 13 AQUA 30 40 OF BF AQUA 30 40 OF BF INOX ...

Page 16: ...b 4 7 CLEANING AND MAINTENANCE Preventive maintenance and checking of the efficient operation of the equip ment and safety devices must be car ried out at the end of each heating season exclusively by the authorised technical staff 4 7 1 Cleaning smoke ducts Use an adequate swab for cleaning the smoke ducts of the boiler After cleaning position the circulators in their original position fig 15 4 7...

Page 17: ...Check the regular fuel flow the cleanness of the filters of the nozzle and air vent from the tube Check the regular spark ignition and the proper function of the burner The burner ignites regularly but the flame goes out immediately Check the flame detection the air calibration and the function of the appliance Difficulty in regulating the burner and or lack of yield Check the regular flow of fuel...

Page 18: ... range of between 45 and 85 C The temperature setting can be checked on the thermometer To ensure optimal boiler efficiency at all times we recommend not to drop below a minimum working tem perature of 60 C fig 21 USER INSTRUCTIONS WARNINGS In case of fault and or incorrect operation deactivate it without making any repairs or taking any direct action If fuel or combustion is smelt air the room an...

Page 19: ...ET button to restart the ignition conditions until the flame lights up fig 23 This operation can be repeated 2 3 times at maximum and in case of fail ure contact the authorised technical staff ATTENTION Make sure that there is fuel in the tank and that the taps are open After each fill up of the tank it is advisable to interrupt the opera tion of the burner for about one hour TURNING OFF BOILER It...

Page 20: ... the fore seen limit discharge the superfluous amount by operating on the vent knob of any radiator CLEANING AND MAINTENANCE At the end of each heating season it is essential to have the boiler thoroughly checked and cleaned out Preventive maintenance and checking of the efficient operation of the equip ment and safety devices must be car ried out exclusively by the authorised technical staff 84 0...

Page 21: ...vigenti in mate ria e rispondono per caratteristiche tecniche e funzionali alle prescrizioni delle norme UNI 7936 dicembre 1979 FA130 84 FA168 87 EN 303 1994 Le caldaie a gasolio sono inoltre conformi alla DIRETTIVA RENDIMENTI 92 42 CEE La ghisa grigia utilizzata è del tipo EN GJL 150 secondo la norma europea UNI EN 1561 Il sistema qualità aziendale è certificato secondo la norma UNI EN ISO 9001 2...

Page 22: ......

Page 23: ......

Page 24: ...Cod 6276007C 04 09 Documentation Dpt Fonderie Sime S p A Via Garbo 27 37045 Legnago Vr Tel 39 0442 631111 Fax 39 0442 631292 www sime it ...

Reviews: