I. Connect user supplied power (if used). In cases where the user does
not want to use the AC adapter but wants to supply 24VDC power to
the PerforMAX IQ system, user supplied 24VDC power may be
applied two ways.
The
“Power In” connector on the end panel of the PerforMAX IQ
power supply may be used to supply power to the system. This
connector requires the use of a Switchcraft 760K barrel type power
plug. The plug should be wired +24VDC to center and common
(ground) to outer barrel. The common must be bonded to electrical
ground. Wired in this fashion, the
“Power” switch on the end panel of
the power supply is in circuit. Where a communication module is
used, power will also have to be supplied through the
“Power In”
connector on the end panel of the communication module.
The
“Alarm Output” connector on the end panel of the PerforMAX IQ
power supply may be used to supply power to the system. This
connector requires the use of a standard DP25 connector. The
connector should be wired:
·
+24VDC to pins 13 & 25
·
Common (ground) to pins 12 & 24
To ensure current carrying capacity, two pins are used for each
connection. The common must be bonded to ground. Wired in this
fashion, the
“Power” switch on the end panel of the power supply is
bypassed. See Power Supply Alarm Output Connections illustration.
Power supplied in the above fashion must have adequate current
available to power all components on the system (power supplies:
maximum 4A, communication modules: maximum 1A). Input power
should be appropriately fused for safety purposes.
SECTION 6: Operation
NOTE – Before switching on power supply; ensure units are
properly grounded and static bar & probes are properly installed.
6.1 Power Supply Indicators
Power:
Lights (green) to indicate power is on and the PerforMAX IQ
system is ready to operate.