scorpION3 5200969 Rev 4
7
2.2 Wiring Considerations
The scorpION3 may be configured for independent operation or
configured for multiple bar installations. In multiple bar installations,
one bar may be designated as the master and serve as the system
controller, by assigning it to address 0 (zero).
For installations of up to 3 bars, Simco’s AC adapter power supply
can be utilized. Install all bars and interconnect wiring before
applying power. Plug the adapter power cord into a grounded
electrical outlet of 100 to 240 VAC, 50 or 60 HZ. Connect the
adapter to one of the scorpION3 bars with a modular cable. The
power will automatically be distributed to the other bars in the
‘chain’. The scorpION3 bar has no on/off switch so application of
the 24 VDC to the unit will turn it on and ionization will begin. The
power supply and wiring can be located as desired by the user.
For other installations 24 VDC power can be supplied via the RJ-11
modular connector. Connect pins 1 & 6 to the +24 volt supply
voltage and connect pins 3 & 4 to ground (ground serving as the
return for the supply voltage), see table below. Users connecting to
the scorpION3 in this method must be able to supply 200mA per bar
connected.
Summary of Contents for scorpION3
Page 1: ...I O N I Z A T I O N S O L U T I O N S Ionizing Bar System scorpION3TM User s Manual...
Page 6: ...scorpION3 5200969 Rev 4 1 1 Description 1 1 scorpION3 Ionizing Bar System 1 2 Features...
Page 29: ...scorpION3 5200969 Rev 4 24...
Page 30: ...scorpION3 5200969 Rev 4 25 3 Operation 3 1 Settings...
Page 41: ...scorpION3 5200969 Rev 4 36...
Page 42: ...scorpION3 5200969 Rev 4 37 5 Specifications 5 1 Specifications 5 2 Parts Accessories...
Page 49: ...scorpION3 5200969 Rev 4 44...