SYSTEM OPERATIONS-68
Maintenance of the
Trim Tab System
is
as follows:
Silverton recommends painting the trim
tabs with good quality, antifouling bottom
paint. DO NOT paint any hinges or the
moving parts of the cylinders.
To reduce the risk of electrolysis and
galvanic corrosion, Silverton recommends
the installation of sacri
fi
cial zinc anodes
on the trim tab plates at least once a year,
preferably during preparation for spring
launch. DO NOT paint the sacri
fi
cial zinc
anodes.
Periodically examine the trim tabs for
accumulation of underwater growth and
clean as necessary.
Periodically examine the trim tab pump
and hydraulic lines, which are located
in the bilge area, for leaks (Refer to the
Mechanical Schematic in the Schematic
Section of this Owners Manual for the lo-
cation of the trim tab pump). Tighten con-
nections if leaks are noted. If the hydraulic
lines appear worn or chafed, contact your
Silverton dealer for inspection and re-
placement, if necessary. The photo below
shows the trim tab pump.
Refer to the BENNETT TRIM TAB Manual
included with your owner’s packet for tech-
nical information concerning the operation
and maintenance of the trim tab system.
Summary of Contents for 35MY
Page 1: ......
Page 6: ...INTRODUCTION 6...
Page 8: ...INTRODUCTION 8...
Page 12: ...INTRODUCTION 12...
Page 28: ...35MY Getting Familiar 8...
Page 38: ...35MY Getting Familiar 18...
Page 58: ...SAFETY 18...
Page 64: ...SYSTEM OPERATIONS 6...
Page 66: ...SYSTEM OPERATIONS 8...
Page 68: ...SYSTEM OPERATIONS 10...
Page 86: ...SYSTEM OPERATIONS 28...
Page 88: ...SYSTEM OPERATIONS 30...
Page 92: ...SYSTEM OPERATIONS 34...
Page 96: ...SYSTEM OPERATIONS 38...
Page 106: ...SYSTEM OPERATIONS 48...
Page 118: ...SYSTEM OPERATIONS 60...
Page 120: ...SYSTEM OPERATIONS 62...
Page 122: ...SYSTEM OPERATIONS 64...
Page 124: ...SYSTEM OPERATIONS 66...
Page 128: ...SYSTEM OPERATIONS 70...
Page 132: ...SYSTEM OPERATIONS 74...
Page 134: ...SYSTEM OPERATIONS 76...
Page 136: ...SYSTEM OPERATIONS 78...
Page 152: ...OPERATION 6...
Page 160: ...GLOSSARY 6...
Page 162: ...GLOSSARY 8...
Page 163: ...GLOSSARY 9 MAINTENANCE LOG DATE MAINTENANCE PERFORMED HOURMETER...
Page 164: ...GLOSSARY 10 MAINTENANCE LOG DATE MAINTENANCE PERFORMED HOURMETER...
Page 166: ...GLOSSARY 12...
Page 172: ...GLOSSARY 18...
Page 175: ......
Page 176: ......
Page 177: ......
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......
Page 189: ......
Page 190: ......
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 196: ...35 MOTOR YACHT INTERIOR...
Page 197: ......
Page 198: ...35 MOTOR YACHT Mechanical Arrangement Detail A...
Page 199: ...35 MOTOR YACHT Mechanical Arrangement Detail B...
Page 200: ...35 MOTOR YACHT Mechanical Arrangement Detail C...
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......