background image

Figure 16 & 17: 

Place the board

in the desired position on

board

A

and clamp firmly. Draw a centre line for the dowel

holes on board

B. 

Place the dowel locator with the side

centre marks on the centre line, push the angle fence
against board

and clamp. Then drill as shown in

Figure

14.

Figure 18: 

T-Joint.

Figure 19 & 20: 

Draw a centre line for the dowel holes on

board

B. 

Clamp board

A

at a distance of 35mm from the

drawn line.

Important: 

The depth stop must be re-adjusted (board

thickness 5mm). Now place the dowel locator with the
corresponding guiding groove over the dowel. When drilling
ensure that the centre marks are aligned with the centre line.

Figure 21: 

End-grain joints.

Figure 22: 

Place the dowel locator on a dowel in board 

A.

Then push the angle fence from the handle side into the
guideway until it rests firmly against the board. Finally tighten
the clamping screw.

Figure 23 & 24:

Clamp board 

A

B

in such a manner that

the marks are visible. Push the dowel locator with the
corresponding guiding groove over the dowel until the angle
fence rests firmly against the board and then drill.

Figure 13 & 14: 

Place board

in a desired position on

board

A

and clamp to the workbench.

Important: 

The depth stop must be re-adjusted (board

thickness 5mm). Place the dowel locator over the
corresponding dowel of board

A

in such a manner that the

angle fence rests firmly against the board and drill.

Figure 15: 

The distance of the dowel from the edge is

maximum 25mm.

13

A

B

A

A

B

B

14

25mm

35mm

16

17

18

15

B

19

22

23

24

20

21

A

B

A

B

A

B

A

B

A

A

A

B

A

508819 Instructions.qxd  5/10/06  2:15 pm  Page 3

Reviews: