Rack Mounting Considerations
007-5683-004
11
Server Precautions
•
Review the electrical and general safety precautions.
•
Determine the placement of each component in the rack before you install the rails.
•
Install the heaviest server components in the bottom of the rack first, and then work up.
•
Use a regulating uninterruptible power supply (UPS) to protect the server from power surges
and voltage spikes and to keep your system operating in case of a power failure.
•
Allow the hot-pluggable SAS/SATA drives and power supply modules to cool before
touching them.
•
Always keep the rack’s front door and all panels and components on the servers closed when
not servicing to maintain proper cooling.
Rack Mounting Considerations
Ambient Operating Temperature
If installed in a closed or multi-unit rack assembly, the ambient operating temperature of the rack
environment may be greater than the ambient temperature of the room. Therefore, consideration
should be given to installing the equipment in an environment compatible with the manufacturer’s
maximum rated ambient temperature (
35º C or 95º F)
.
Reduced Airflow
Equipment should be mounted into a rack so that the amount of airflow required for safe operation
is not compromised.
Mechanical Loading
Equipment should be mounted into a rack so that a hazardous condition does not arise due to
uneven mechanical loading.
Summary of Contents for Rackable H2106-G7
Page 1: ...SGI Rackable H2106 G7 System User s Guide 007 5683 004 ...
Page 4: ......
Page 16: ......
Page 18: ......
Page 24: ......
Page 26: ...2 007 5683 004 1 Introduction Figure 1 1 Rackable H2106 G7 Server Top Removed ...
Page 32: ......
Page 41: ...Check the Node Board Setup 007 5683 004 17 Figure 2 3 Accessing the Inside of the System ...
Page 44: ......
Page 50: ......
Page 68: ......
Page 80: ......
Page 108: ......
Page 110: ......
Page 112: ......