Rack Mounting Considerations
007-5926-002
17
Server Precautions
•
Review the electrical and general safety precautions in
Chapter 2, “System Safety.”
•
Determine the placement of each component in the rack before you install the rails.
•
Install the heaviest server components in the bottom of the rack first, and then work up.
•
Use a regulating uninterruptible power supply (UPS) to protect the server from power surges
and voltage spikes and to keep your system operating in case of a power failure.
•
Allow the hot-pluggable SATA drives and power supply modules to cool before touching
them.
•
Always keep the rack’s front door and all panels and components on the servers closed when
not servicing to maintain proper cooling.
Rack Mounting Considerations
Ambient Operating Temperature
If installed in a closed or multi-unit rack assembly, the ambient operating temperature of the rack
environment may be greater than the ambient temperature of the room. Therefore, consideration
should be given to installing the equipment in an environment compatible with the manufacturer’s
maximum rated ambient temperature (
35º C or 95º F)
.
Reduced Airflow
Equipment should be mounted into a rack so that the amount of airflow required for safe operation
is not compromised.
Mechanical Loading
Equipment should be mounted into a rack so that a hazardous condition does not arise due to
uneven mechanical loading.
Summary of Contents for Rackable C2112-4RP9
Page 1: ...SGI Rackable C2112 4RP9 System User Guide 007 5926 002 ...
Page 4: ......
Page 8: ......
Page 10: ......
Page 12: ......
Page 22: ...6 007 5926 002 1 Introduction Figure 1 4 Serverboard Block Diagram ...
Page 26: ......
Page 46: ......
Page 58: ......
Page 62: ......
Page 66: ......
Page 68: ......