122
007-4653-001
8: System Control
Power Up Confirmation Window
If you press the
Power UP
button in the home window, the power up confirmation
window appears, as shown in Figure 8-7.
To initiate the
power up
command, press the
OK
button. To terminate the command,
press the
Cancel
button. The confirmation window stays visible until the command is
successfully executed. An unsuccessful command results from an L1/L2 error in
processing the command or a time-out while waiting for a response.
Figure 8-7
Power Up Confirmation Window
The
power up
command affects only the list of bricks identified in the destination field.
To set or change the target list, press the
Cancel
button to return to the home window.
Then press the
DEST:
button to change the target list. See “Destination Selection
Window” on page 127 for instructions on using the
DEST:
button.
Power: OFF
L2-001 S/N Nxxxxxxx [System name]
SGI L2 Controller, Firmware xx.xx.x
Press the "OK" button to issue the
"r * s * power up" command.
OK
Cancel
Summary of Contents for Origin 3900
Page 1: ...SGI Origin 3900 Server User s Guide 007 4653 001 ...
Page 3: ...007 4653 001 iii Record of Revision Version Description 001 October 2003 Original Release ...
Page 4: ......
Page 12: ......
Page 18: ......
Page 62: ......
Page 65: ...Product Description 007 4653 001 39 Figure 2 1 512 processor Origin 3900 Server ...
Page 76: ......
Page 104: ......
Page 120: ......
Page 172: ......
Page 198: ......
Page 208: ......
Page 254: ......
Page 274: ......
Page 292: ......