![Silicon Graphics Origin 300 User Manual Download Page 68](http://html.mh-extra.com/html/silicon-graphics/origin-300/origin-300_user-manual_1271648068.webp)
42
007-4498-002
2: Installation Procedures
Figure 2-4 shows the lift openings and dimensions of a short-rack shipping crate. This
figure also shows where to position the pallet jack.
Figure 2-4
Short-rack Shipping Crate Dimensions
Inspecting the Shipping Crate
After the system is unloaded from the truck, follow these steps before you unpack it:
1. Ensure that the crates and cartons arrive unopened.
2. Inspect the shipping crate for signs of external damage such as dents, holes, crushed
corners, and water marks.
3. Ensure that the tilt watch has not been tripped.
4. If the crate is damaged, file a damage claim with the carrier immediately. In
addition, notify your local Customer Support Center (CSC) for any missing,
incorrect, or damaged items.
CSC contact information is provided at the following URL:
http://www.sgi.com/support/supportcenters.html
Pallet jack position
48.75
(1238 mm)
42.75
(1068 mm)
29.25
(743 mm)
Side View
End View
Summary of Contents for Origin 300
Page 1: ...SGI Origin 300 System with NUMAlink Module User s Guide 007 4498 002 ...
Page 4: ......
Page 26: ......
Page 39: ...Base System Components 007 4498 002 13 Figure 1 10 L2 Controller ...
Page 49: ...Optional System Components 007 4498 002 23 Figure 1 17 SGI TP9400 Storage System ...
Page 54: ...28 007 4498 002 1 Introduction Figure 1 18 Tape Drive Libraries L20 L40 L80 L180 L700 ...
Page 78: ......
Page 118: ......
Page 264: ......