Powering the System On and Off
007-5806-004
5
When using the SGI cluster manager software, you can monitor and manage your server from a
remote location. See the
SGI Management Center Administration Guide for Clusters
,
(P/N 007-6358-00x) for more information.
Preparing to Power On
To prepare to power on your system, follow these steps:
1. Check to ensure that the cabling between the rack’s power distribution units (PDUs) and the
wall power-plug receptacle is secure.
2. For each individual blade enclosure pair that you want to power on, make sure that the power
cables are plugged into all the blade enclosure power supplies correctly, see the example in
Figure 1-3. Setting the circuit breakers on the PDUs to the “On” position will apply power to
the blade enclosure supplies and will start each of the chassis managers in each enclosure.
Note that the chassis managers in each blade enclosure stay powered on as long as there is
power coming into the unit. Turn off the PDU breaker switch that supplies voltage to the
enclosure pair if you want to remove all power from the unit.
Power cord
Figure 1-3
Blade Enclosure Power Supply Cable Example
3. If you plan to power on a server that includes optional mass storage enclosures, make sure
that the power switch on the rear of each PSU/cooling module (one or two per enclosure) is
in the
1
(on) position.
Summary of Contents for ICE X
Page 1: ...SGI ICE X System Hardware User Guide Document Number 007 5806 004 ...
Page 4: ......
Page 10: ......
Page 14: ......
Page 27: ...Powering the System On and Off 007 5806 004 7 Figure 1 5 Three Phase PDU Examples ...
Page 36: ......
Page 78: ...58 007 5806 004 4 Rack Information Figure 4 2 Front Lock on Tall 42U D Rack ...
Page 80: ...60 007 5806 004 4 Rack Information Figure 4 4 Air Cooled D Rack Rear Door and Lock Example ...
Page 84: ...64 007 5806 004 4 Rack Information Figure 4 6 SGI ICE X Multi Cell M Cell Rack Array Example ...
Page 86: ......