SCSIBox 2 Chassis Tour
13
Front View
These components are located on the front of the SCSIBox 2 (see
Figure 2-2):
Drive door
opens and closes using two quarter-turn, wing-nut
fasteners near the top corners of the box.
Be careful not to
overturn the fasteners or else they may break off
.
Caution:
The door must be in place during operation to comply with FCC
regulations and for proper air flow.
On/Off switch controls power to all the drives.
Drive shelves
house the SCSI drives and drive sleds. The shelves are
removable to accommodate full-height drives.
Note:
Each full-height drive occupies two half-height slots.
Figure 2-2
CHALLENGE Vault SCSIBox 2 (Front View)
Drive door
fasteners
Drive door
On/Off switch
Drive
shelf
Summary of Contents for CHALLENGE CMN A012B
Page 1: ...CHALLENGE Vault Rack and SCSIBox 2 Owner s Guide Document Number 007 1762 040 ...
Page 6: ...vi Figures ...
Page 7: ...vii Tables Table A 1 Vault Rack Specifications 23 Table A 2 SCSIBox 2 Specifications 25 ...
Page 8: ...viii Tables ...
Page 10: ...2 Introducing the CHALLENGE Vault Rack and SCSIBox 2 Figure 1 1 Vault Peripherals Rack ...
Page 18: ......
Page 30: ...22 Operating the SCSIBox 2 and Vault Rack ...
Page 34: ...26 Specifications ...
Page 39: ......