
LE100/1
Commissioning English
LE100/1 · Date
10.09.2018 · Art.
No.
83230 · Mod.
status
232/18
24
Fig. 8: Mounting connection type E6
Strand cross sections of lines 0.14 ... 0.5 mm².
5 Commissioning
Following correct mounting and wiring you can put the measuring system
into operation by switching on operating voltage.
After switching on, the device initializes itself independently.
Only design "M": When the sensor is moved along the magnetic tape, LEDs
are activated as follows:
LED
Color
Function
A
green
Power
B
red
Active if sin < /sin
C
red
Active if cos < /cos
D
red
Active if /ref < ref
Fig. 9: LEDs
A B C D