background image

 

This document is proprietary and confidential. No part of this document may be disclosed in any manner to a third party without prior 
written consent. © Siklu Communication Ltd 2021 All rights reserved. 

23 

4.  Installing the MultiHaul™ TG  Units

 

 

 

 

 

 
 
 

 

4.7 Mounting and Aligning the MultiHaul™ TG TU on a Pole or  Wall 

The TU is provided with a pre-attached mounting bracket suitable for mounting on a pole or wall. 

 

Field of View Considerations while Mounting 

 

When mounting the TU using the attached mounting bracket, the FOV (field-of-view) of the TU is as follows: 

 

horizontal: ±45° electronically. 

 

vertical : ±35° (25° electronically and 10° mechanical adjustment, achieved through the elevation lock bolts). 

1.

 

Elevation lock bolts (2 x 7 mm on each side) 

2.

 

All-weather shells (1 or 3, depending on model) 

3.

 

Self-locking bands fixing points (for 2 x 130 mm bands 

provided) 

4.

 

Wall-mount fixing holes (4) 

5.

 

Mounting bracket 

 

TUs should be pointed towards the node. 

Summary of Contents for MultiHaul TG

Page 1: ...MultiHaul TG Wireless 60 GHz L2 SDN Mesh for Multi Gigabit Ethernet Installation Operation and Maintenance Manual MHTG I O 01 Issue A03 February 2021...

Page 2: ...ts reserved No part of this publication may be reproduced or distributed in any form or by any means or stored in a database or retrieval system without the prior written consent of Siklu Disclaimers...

Page 3: ...Physical and Environmental Requirements 13 4 1 2 Cabling Requirements 14 4 1 3 Node Orientation 15 4 2 MultiHaul TG Package Contents 15 4 3 Unpacking the MultiHaul TG Units 15 4 4 Required Tools 15 4...

Page 4: ...manner to a third party without prior written consent Siklu Communication Ltd 2021 All rights reserved 4 1 Introduction 4 10 3 Configuring the System 29 4 11 Resetting the Unit 30 5 Management Concep...

Page 5: ...3 Audience This document assumes a working knowledge of wireless connectivity platforms and their operating environments This document is intended for use by persons involved in planning installing co...

Page 6: ...Memory PD PoweredDevice PoE Power overEthernet PSE Power SourcingEquipment RAM Random Access Memory SDN Software Defined Networking SFP Small Form Factor Pluggable UV Ultraviolet SFF Small Form Factor...

Page 7: ...nt andreceiver Connect the equipment into an outlet on a circuit different from that to which the receiver isconnected Consult the dealer or an experienced radio TV technician for help 2 3 Canada Regu...

Page 8: ...e services a des d obligations juridiques et financi res Les revendeurs ou distributeurs de ces quipements ne sont pas responsables des blessures des dommages ou violations des r glements li s l insta...

Page 9: ...power and data This section provides a brief overview of the MultiHaul TG units The MultiHaul TG family consists of the following units MultiHaul TG N366 a compact multi sector unit deployed as a L2 S...

Page 10: ...martHaul EMS T265 TUs Featuring 90 scanning for easy installation long distance and high performance a TU can be installed on a pole or wall to serve between 1 3 connected devices with a copper or fib...

Page 11: ...diameters Node 1 5 12 TU 1 5 4 Directly on a wall using the AX MK WM accessory ordered separately from Siklu or your reseller Do not mount a MultiHaul TG unit on a structure that is temporary or easi...

Page 12: ...voltage is nearly the same as PoE port input voltage The total cable length from the PoE injector or PSE device to the last powered device PD should not exceed 100meters PSE to first unit first unit t...

Page 13: ...this planned azimuth as described in Section 4 5 Mounting and Aligning the MultiHaul TG Node on a Pole Step 7 4 2 MultiHaul TG Package Contents The MultiHaul TG N366 or T265 packages include the follo...

Page 14: ...ul TG Node on a Pole To mount the node on a pole 1 Insert self locking bands in the mounting bracket 2 Align the mounting bracket with the arrow pointing up and mount it on the pole 3 If all four sect...

Page 15: ...ment may be disclosed in any manner to a third party without prior written consent Siklu Communication Ltd 2021 All rights reserved 17 4 Installing the MultiHaul TG Units 4 Ensure that the 4 mounting...

Page 16: ...in any manner to a third party without prior written consent Siklu Communication Ltd 2021 All rights reserved 20 4 Installing the MultiHaul TG Units 6 Tighten the four mounting bracket screws so that...

Page 17: ...tor 1 is aligned in accordance to the network design and instructions you received from your or Siklu s Planning Team see Section 4 1 3 Node Orientation If required slightly release the self locking b...

Page 18: ...nsent Siklu Communication Ltd 2021 All rights reserved 22 4 Installing the MultiHaul TG Units 4 6 Mounting the MultiHaul TG Node on a Wall The node can be mounted on a wall using the AX MK WM accessor...

Page 19: ...uitable for mounting on a pole or wall Field of View Considerations while Mounting When mounting the TU using the attached mounting bracket the FOV field of view of the TU is as follows horizontal 45...

Page 20: ...GbE PoE in ETH2 RJ45 1 GbE PoE out AUX USB For future use When mounting the TU on a pole if additional vertical adjustment is required use the EH MK SM mounting kit When mounting the TU on a wall usin...

Page 21: ...oved to UL EN IEC 60950 1 and which is CDRH registered AUX USB For future use 4 8 3 Weatherproofing the Cables Before connecting a cable to a unit you must first enclose the cable connector in a prote...

Page 22: ...Pick a rubber gasket matching the cablediameter and insert the gasket snugly into the shell 4 Secure the connector lock do not use tools 5 Attach the cable to the lock with two cable ties 4 8 4 Groun...

Page 23: ...PoE through the Ethernet cableconnected to ETH1 Direct DC input range 36 57 Vdc by using an RJ45 DC adapter that can be purchased from Siklu or your reseller P N EH PoE DC adaptor In this case port ET...

Page 24: ...an be to another node or a TU on any sector TU on connected to the node Off No link ETH1 Green Node on 10 GbE link TU on 2 5 GbE link Orange Node on 5 2 5 1 GbE 10 100 Mbps link TU on 1 GbE 10 100 Mbp...

Page 25: ...form the following checks on each TU 1 Point the TU towards the serving node see Section 4 7 Mounting and Aligning the MultiHaul TG TU on a Pole or Wall 2 Verify the self locking bands and the elevati...

Page 26: ...tion Ltd 2021 All rights reserved 30 4 Installing the MultiHaul TG Units 4 11 Resetting the Unit The MultiHaul TG unit includes a pushbutton next to the USB port on the connector panel under the unit...

Page 27: ...G is a data modeling language for the definition of data sent over NETCONF It can be used to model both configuration data and state data of network elements 4 1 Connecting to the CLI To establish a C...

Page 28: ...nt subnets and associated with different VLANs The IP addresses and gateway are managed through the ip container as follows Parameter Mandatory Values Remarks ipv4 address List of static IPv4 addresse...

Page 29: ...delete management IPv4 addresses and the default gateway type the following commands To show the management IP configuration type the following command MH N366 show ip ipv4 ipv4 address ip 31 168 34 1...

Reviews: