Instruction Manual VisGuard 2 E xtractive
Decommissioning/Storage
38
14265E/1
12
Decommissioning/Storage
12.1
Decommissioning the system
The aim of decommissioning is to prepare the individual components of the system properly
for storage.
WORKSTEP
ADDITIONAL INFO / IMAGES
1.
Interrupt the service voltage.
2.
Remove the electrical connections to all com-
ponents.
3.
Remove all other components.
4.
Close all openings on the components.
12.2
Storing the components
There are no special requirements for storing the components. However, please note the
following information:
The VisGuard 2 Extractive and associated components contain electronic parts. Storage
for such components must fulfill the usual conditions. It is important to note that the
storage temperature must be between -30 and +55 °C.
All components that come into contact with the medium during operation have to be
dry and clean for a long time before being put into storage.
The measuring equipment with all of the accessory parts must be protected against
weather factors, condensing humidity and aggressive gases during storage.