13
3.
Recheck the strap alignment at
the rear of the tool and realign if
necessary. Release the tension
motor.
Press down the Green Tension
Control Lever to begin
tensioning the strap.
When the tension motor stalls, indicating completion of tension, release the control lever. The
strap will remain tensioned around the package.
NOTE: If the strap alignment is unsatisfactory or the tool needs to be removed before sealing.
First, move the Red tension release latch to the left to disengage the tension motor. Continue
to remove the tool from the strap by first lifting up the tension release lever found on the
bottom of the gear housing while squeezing the tension motor and stationary handle together
to open the strap path.
4.
Press the Blue Sealer Control
lever to begin the sealing cycle.
It is not necessary to continue
holding the lever down once the
weld cycle has started.
Summary of Contents for TENSION-WELD VT-19HD
Page 1: ...VT 19 25 HD TENSION WELD STRAPPING TOOL...
Page 5: ...5 MAJOR COMPONENTS...
Page 10: ...10 PNEUMATIC INFORMATION Continued Pneumatic Circuit Diagram...
Page 24: ...32...