12/14/10
MACHINE DISCONNECT AND LOCK-OUT PROCEDURES
This machine is equipped with shut off devices which satisfy OSHA Regulation 1910.147 (control
of hazardous energy sources - lock out/tag out).
Become familiar with the location, and operation of each shutoff device.
Disconnect/Lock-Out all power sources before servicing machine.
Never use machine operating controls as a means for locking out power.
ELECTRICAL
The machine is ready to operate when connected to the main power supply and the main switch
QS I is switched to ON position. It takes approximately I minute for the heating element to reach
its operating temperature.
The machine is switched on and off with the main switch QS 1 located on the machine front
operating panel.
P
Turn the main disconnect switch to the OFF position.
P
Locate the appropriate locking hole on the switch, and apply a locking device.
NOTE: Some electrical components in the machine may be electrically charged after the power is
shut off. Wait no less than one minute after the power has been disconnected before servicing the
panel.
8
Summary of Contents for TABLE-TYER
Page 1: ...12 14 10 ...
Page 7: ...12 14 10 7 ...
Page 9: ...12 14 10 ELECTRICAL SCHEMATIC TABLE TYER 9 ...
Page 10: ...10 ...
Page 11: ...11 ...
Page 12: ...12 ...
Page 17: ...12 14 10 17 ...
Page 18: ...12 14 10 18 ...
Page 19: ...12 14 10 19 ...
Page 23: ...12 14 10 23 ...
Page 27: ...12 14 10 27 ...
Page 28: ...12 14 10 28 16 1 430720 Stop 17 1 430721 Insert 18 2 430722 Screw 19 1 430723 Nut ...
Page 29: ...12 14 10 29 ...
Page 30: ...12 14 10 30 ...
Page 32: ...12 14 10 32 ...
Page 34: ...12 14 10 34 ...
Page 36: ...12 14 10 36 ...
Page 39: ...12 14 10 39 ...