4.01 

OPERATION 

 

WARNING:

  DO NOT LEAVE OZONE ON WITHOUT GAS FLOW 

 
1. 

Ensure that all connections have been made in accordance with the 

 

installation instructions. 

 
2. 

Set 10 psig or 0.75 bar gauge (approx.) to regulators of both the span 

 

gas and NO cylinder and the oxygen/air cylinder. 

 
3. 

Balance the NO and NOx modes of your NOx analyser, ensuring they 

 

both zero and span correctly.  Select no mode. 

 
4. 

Press the Power ON switch but not the Ozone switch at this stage. 

 
5. 

Select OFF position for oxygen. 

 
6. 

Adjust the span flow control to a suitable rate for your NOx analyser   and 

leave to settle until a suitable reading of the NO span gas is  

obtained on the 

analyser. 
 
7. 

Open the oxygen ON/OFF flow valve on the Noxgen front panel (G)  

and 

adjust the flow of this oxygen using the flow control (I) until the   analyser reading 
falls by about 10% of the original reading in step 6.   

Record this reduced 

reading (Reading A). 
 
8. 

Switch on the ozone using the Ozone ON/OFF button B and adjust the 

 

ozone level using both the coarse adjust switch (H) and the fine 

 

thumbwheel adjust switches (F). 

 
 

This adjustment should be made until the analyser reading is further 

 

reduced so that it is now about 20% of the reading taken in Step 6.  At 

 

this stage the ozone in the Noxgen is converting the NO span gas to 

 

NO2 and the fall in reading corresponds to the level of NO2 now being 

 

generated.  Whatever you do, always allow 10% of the reading in Step 

 

6 (A) to remain.  Record this new reading from the analyser (Reading  B). 

 
9. 

Having recorded a stable reading B, switch the analyser to the NOx 

 

mode and wait for a steady reading.  Record this reading (Reading C). 

Summary of Contents for NOXGEN III

Page 1: ...doc Page 1 of 17 SIGNAL NOXGEN III NO2 CONVERTER TESTER OPERATION MANUAL NOX III MAN SIGNAL GROUP LTD 12 Doman Road Camberley Surrey GU15 3DW UK Tel 44 0 1276 682841 Fax 44 0 1276 691302 e mail instru...

Page 2: ...Group Ltd While we believe that the information and guidance given in this manual is correct all parties must rely upon their own skill and judgement when making use of it The Signal Group Ltd will n...

Page 3: ...4 2 02 The Ozonizer 5 2 03 Flow Scheme Diagram 6 2 04 Remote Control Flow Scheme Diagram 7 3 00 INSTALLATION 8 3 01 General 8 3 02 Installation Drawing 9 3 03 Span Gas Connection 10 3 04 Oxygen Air In...

Page 4: ...ce or Distributor 1 Before any connection is made unscrew the 4 cross head screws on instrument cover lid 2 Slide lid back to reveal the internal assemblies of the instrument NOTE Do not take the cove...

Page 5: ...e corona discharge technique Stability against mains power variations and the consequent effects of NO2 concentrations is ensured by the incorporation of a voltage stabilised electronic circuit feedin...

Page 6: ...NOXGEN III utilises a very efficient high energy lamp system which ionises oxygen to ozone The ozonizer is built into a fully self contained enclosure within the instrument This should not be opened...

Page 7: ...SIGNAL GROUP LTD s sales masters manuals noxgman doc Page 7 of 17 Figure 2 03 Flow Scheme Diagram...

Page 8: ...SIGNAL GROUP LTD s sales masters manuals noxgman doc Page 8 of 17 Figure 2 04 Remote Control Flow Scheme Diagram...

Page 9: ...t will need to be removed To do this undo the 4 cross head screws on the under cover and slide back the cover to remove it With the cover removed you can easily unscrew the four feet before replacing...

Page 10: ...SIGNAL GROUP LTD s sales masters manuals noxgman doc Page 10 of 17 Figure 3 02 Installation Diagram...

Page 11: ...but dry air can be used with almost as high an ozone production as that using oxygen Also the Signal Model NOXGEN III has been carefully designed so that no nitric oxide is generated from the nitroge...

Page 12: ...ny of the function pins can be utilised the remote enable must be operated and again either an OV logic signals via the earth return or a short circuit wire link can be used Without the remote enable...

Page 13: ...SIGNAL GROUP LTD s sales masters manuals noxgman doc Page 13 of 17 Figure 4 00 Operational Controls...

Page 14: ...ygen ON OFF flow valve on the Noxgen front panel G and adjust the flow of this oxygen using the flow control I until the analyser reading falls by about 10 of the original reading in step 6 Record thi...

Page 15: ...the analyser reading This reading should now represent the same as obtained in Step 6 The only difference now from Step 6 is that you have the analyser in its NOx mode and therefore any NO2 which was...

Page 16: ...e enable control is activated the instrument will behave the same as the standard manual controlled Noxgen and the operation as explained in Steps 1 11 can be carried out as normal With power off all...

Page 17: ...SIGNAL GROUP LTD s sales masters manuals noxgman doc Page 17 of 17 Figure 4 02 Chart Display...

Reviews: