![Siemens Wallace & Tiernan Chem-Ad VPP Instruction Manual Download Page 61](http://html.mh-extra.com/html/siemens/wallace-and-tiernan-chem-ad-vpp/wallace-and-tiernan-chem-ad-vpp_instruction-manual_385615061.webp)
Chem-Ad
®
VPP / VPP-E / VPP-DC
Installation
4.
61
English
4. Installation
4.1
Installation
Warning!
Risk of injury or damage to the peristaltic metering pump!
Only authorized and qualified specialists may install the peristaltic
metering pump. All electrical work on the unit may only be
performed by qualified electricians. Modifications to the unit which
go beyond those described in this manual are not permissible.
4.1.1
Ambient conditions at the site
The following must be taken into account when installing the
peristaltic metering pumps:
•
The peristaltic metering pump must be protected against rain,
frost and direct sunlight and may therefore not be installed
outdoors.
•
Mount the peristaltic metering pump on a flat wall in a frost-
free room with an ambient temperature of 5 to 50 °C.
•
The air in the room should be non-condensing.
•
Mount the peristaltic metering pump at a location where it is
protected against mechanical damage, shock (vibration),
water and vapors, alkalines and acids.
•
Always mount the peristaltic metering pump above the level of
the tank (note the max. suction height of 2 m), peristaltic
metering pump housing vertical, hose connections
downwards.
•
If the end of the discharge hose (point of application) is below
the level of the tank, we recommend installing a backpressure
valve (max. 0.5 bar opening pressure) at the point of
application to prevent the tank from emptying by siphoning.
•
If the discharge head is very high, mount the peristaltic
metering pump so that the suction pipe is short and the
discharge pipe is longer (peristaltic metering pumps run
considerably better in positive pressure operation than in
negative pressure operation).
Please note
Note the max. pressure range of the peristaltic metering pump.
max. 2 m
A
B
A Applicator
B Suction lance/bottom priming
l
Summary of Contents for Wallace & Tiernan Chem-Ad VPP
Page 30: ...30 WT 490 250 000 DM IM 0911 Bedienung Chem Ad VPP VPP E VPP DC 5 Deutsch ...
Page 34: ...34 WT 490 250 000 DM IM 0911 Wartung Chem Ad VPP VPP E VPP DC 6 Deutsch ...
Page 42: ...42 WT 490 250 000 DM IM 0911 Ersatzteile und Zubehör Chem Ad VPP VPP E VPP DC 8 Deutsch ...
Page 45: ...Chem Ad VPP VPP E VPP DC 45 English Peristaltic Metering Pumps Chem Ad VPP VPP E VPP DC ...
Page 46: ...46 WT 490 250 000 DM IM 0911 Chem Ad VPP VPP E VPP DC English Please note Original manual ...
Page 74: ...74 WT 490 250 000 DM IM 0911 Operation Chem Ad VPP VPP E VPP DC 5 English ...
Page 78: ...78 WT 490 250 000 DM IM 0911 Maintenance Chem Ad VPP VPP E VPP DC 6 English ...
Page 86: ...86 WT 490 250 000 DM IM 0911 Spares and Accessories Chem Ad VPP VPP E VPP DC 8 English ...
Page 89: ...Chem Ad VPP VPP E VPP DC 89 Français Pompes doseuses péristaltiques Chem Ad VPP VPP E VPP DC ...
Page 116: ...116 WT 490 250 000 DM IM 0911 Installation Chem Ad VPP VPP E VPP DC 4 Français ...
Page 124: ...124 WT 490 250 000 DM IM 0911 Maintenance Chem Ad VPP VPP E VPP DC 6 Français ...
Page 135: ...Chem Ad VPP VPP E VPP DC 135 ...