14 – 4
14.3
Operations counter
The operations counter is incremented when the circuit breaker completes the charging cycle (manual or electrically operated).
The mechanical operations counter can be installed only if the circuit breaker is equipped with a motor-operated mechanism.
Knocking out the fields on the front panel
Catalog No.
Catalog No.
Mechanical operations counter
WLNUMCNT
1
2
PZ 1
Front panel
knock out
Use a suitable base.
deburr
Summary of Contents for UL 1066
Page 56: ...7 5 7 2 Frame size II fused ...
Page 58: ...7 7 ...
Page 63: ...7 12 8 27 210 0 8 27 210 0 8 27 210 0 3 75 95 2 ...
Page 64: ...7 13 ...
Page 65: ...7 14 7 7 Frame size III fuse carriage ...
Page 66: ...7 15 ...
Page 69: ...7 18 7 9 External sensor for neutral conductor WLNCT2 ...
Page 70: ...7 19 WLNCT3 ...
Page 85: ...9 5 I tripping Ground fault tripping ...
Page 231: ...15 12 Pre assembling the locking module Installing 0767 1 2 3 4 6 5 ...
Page 232: ...15 13 1 Socket head cap screw M5 with washer and nut 7 8 Size 4 5 Nm 45 lb in ...
Page 289: ...23 7 23 3 3 Installing arc chutes 1 2 6 5 PH 2 0043 02 3 4 5 6 For frame size III 3 PH 2 ...
Page 298: ...23 16 6 7 8 9 5 2 1 Size 5 mm ...
Page 333: ......