Siemens TITANUS 3000 Quick Manual For Commissioning Download Page 2

3 Commissioning

Initializing of airflow monitoring

1.

press button S2 

“Init”

2.

Fix cover and tighten screws. ( within the next 2 min.!)

3.

after approx. 20 min the unit will memorise the “air flow normal” value of the tubing connected.
(front LED green flashing)

Internal LED’s on Interface pcb K3I100 (below detector)

LED’s

KO

H1

gn

detector communication

normal

MA

H2

gn

detector answering

normal, short flashing

ST

H3

ye

general fault. interface pcb

AW

H4

ye

application warning

35 / 100 sec.:    detector programming

MS

H5

ye

detector fault

detector defective,  try push button 

“Reset

Note : Press of button “

Reset

” only required, when detector was changed on running unit.

1

X8

2

3

4

5

7
8

9

10

11

12
13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33
34

1

2

3

4

X11 

Rückstellen
Reset

2.Sens.
(LowSens)

Störung
Fault

Hauptalarm
Alarm

Voralarm
Prealarm

Infoalarm

-Ub

+Ub

24VDC

AL1

(GS1)

AL2

(GS2)

AL3

(GS3)

Anschlussklemmen

Connection block

TITANUS 3000

(normal)

(gestört)

(fault)

-

+24V

2.Sens

Reset

Speisung

Supply

-

+24V

-

+24V

-

+24V

-

+24V

external

internal

1

2

3

4

5

6

7

8

9

10

A

B

C

D

E

F

G

H

I

J

ON OFF

ON

OFF ON

12

3

4

Switches

pcb basis

Function

Values

Modus

Algorithms

on function “Day”

Air flow

range

Function

Values

Algorithms

on function “Night”

Switches

pcb interface

Fault latching

Air flow

monitoring

delay time

Siemens Building Technologies AG
Alte Landstrasse 411
CH-8708 Männedorf
Tel. +41 1 - 922 61 11
Fax +41 1 - 922 64 50

www.cerberus.ch

Document no.  e4162b

Manual -

Edition 07.2001

Section -

Reviews: