PROCEDURES

 

 

 

WARNING

 

HIGH  VOLTAGES ARE  PRESENT

TURN  OFF  POWER   

BEFORE  INSTALLATION OR  SERVICING. 

 

The use of temporary  ground  during  installation  and maintenance  is recommended

.

 

 

1) 

Install one  washer  over the threads  at the end of the SP-36  housing.  Push the washer 
up against  the housing.

 

 

2) 

Choose  a knockout  in the load  center  that is a distance  from  the backboard that will 
allow the back  of the SP-36  to lay flat against  the backboard.

 

 

3) 

Install the second  washer  on the threads  at the end of the SP-36  housing  from inside 
the load  center

.  

Install the lock nut  so that it loosely  holds  the SP

-

36  in place.

 

 

4) 

Use the wood  screw  provided  to secure  the  SP-36  mounting  tab  to the backboard

.

 

 

5) 

Tighten  the lock nut installed  in step 3 for a snug  fit.

 

 

Cut the  wires  on the SP-36  to the minimum  usable  length

Do not coil the wires  as this 

greatly  reduces SP-36 performance

.  

Also

avoid  kinks  and  sharp bends  in the wiring

.

 

 

7)  Connect  the  wires to the load center, observing  the proper  hook-up  scheme.

 

 

8)  The  wires  must  be connected  so that  there  is a fuse  or circuit  breaker  between  the SP-

36 and the power  service  line.

 

 

HOOK  UP  SCHEMES

 

 

 