Page 20
Copyri
Commissioning and Operation
WARNING:
Be aware that only qualified personnel must connect the
Microinverter to the electrical utility grid.
WARNING:
Ensure that all AC and DC wiring is correct. Ensure that none of the AC and
DC wires are pinched or damaged. Ensure that all junction boxes are properly closed.
WARNING:
Connect the
receiving prior approval from the utility company.
NOTE:
The Status LED of each microinverter will blink green six times to indicate normal
start-up operation one minute after DC power is applied.
Commissioning
To commission the Siemens
1.
Turn ON the AC disconnect or circuit breaker on each microinverter AC branch
circuit.
2.
Turn ON the main utility
producing power
3.
The Siemens Microinverters will begin sending performance data over the power
lines to the Envoy. The time required for all microinverters to report to the Envoy will
vary with the number of microinverters in the system. The first units s
detected within 15 minutes but the entire system could take hours to detect.
4.
The SMIINV215R60
adjustments are required by your local utility, the installer can use the Envoy to
Manage the Grid Profile after all microinverters have been detected.
For more information on Envoy operation, refer to the
http://www.usa.siemens.com/microsolar
Operating Instructions
The Siemens Microinverter is powered on when sufficient DC voltage from the module is applied.
One minute after DC voltage is applied, the status LED blinks green six times indicating proper
start–up. You may need to use a mechanics mirro
the microinverters.
Copyright
2011 Siemens Industry, Inc.
Commissioning and Operation
Be aware that only qualified personnel must connect the Siemens
roinverter to the electrical utility grid.
Ensure that all AC and DC wiring is correct. Ensure that none of the AC and
DC wires are pinched or damaged. Ensure that all junction boxes are properly closed.
Connect the Siemens Microinverter to the electrical utility grid only after
receiving prior approval from the utility company.
The Status LED of each microinverter will blink green six times to indicate normal
up operation one minute after DC power is applied.
Siemens Microinverter PV system:
Turn ON the AC disconnect or circuit breaker on each microinverter AC branch
Turn ON the main utility-grid AC circuit breaker (if applicable). Your system will start
producing power
after a five-minute wait time
.
Microinverters will begin sending performance data over the power
lines to the Envoy. The time required for all microinverters to report to the Envoy will
vary with the number of microinverters in the system. The first units s
detected within 15 minutes but the entire system could take hours to detect.
SMIINV215R60XX has field adjustable voltage and frequency trip points. If
adjustments are required by your local utility, the installer can use the Envoy to
he Grid Profile after all microinverters have been detected.
For more information on Envoy operation, refer to the
Envoy Installation and Operation Manual
usa.siemens.com/microsolar
.
ting Instructions
Microinverter is powered on when sufficient DC voltage from the module is applied.
One minute after DC voltage is applied, the status LED blinks green six times indicating proper
up. You may need to use a mechanics mirror to view indicator lights on the undersides of
141-00015, Rev 01
Siemens
Ensure that all AC and DC wiring is correct. Ensure that none of the AC and
DC wires are pinched or damaged. Ensure that all junction boxes are properly closed.
er to the electrical utility grid only after
The Status LED of each microinverter will blink green six times to indicate normal
Turn ON the AC disconnect or circuit breaker on each microinverter AC branch
Your system will start
Microinverters will begin sending performance data over the power
lines to the Envoy. The time required for all microinverters to report to the Envoy will
vary with the number of microinverters in the system. The first units should be
detected within 15 minutes but the entire system could take hours to detect.
XX has field adjustable voltage and frequency trip points. If
adjustments are required by your local utility, the installer can use the Envoy to
he Grid Profile after all microinverters have been detected.
Envoy Installation and Operation Manual
at
Microinverter is powered on when sufficient DC voltage from the module is applied.
One minute after DC voltage is applied, the status LED blinks green six times indicating proper
r to view indicator lights on the undersides of