Mounting and Commissioning
3.3 Commissioning
SIPROTEC, 7SD5, Manual
C53000-G1176-C169-5, Release date 02.2011
552
Figure 3-32
Measuring voltages for the synchrocheck — example
• If not, first check whether one of the before named messages 2947
„Sync. Udiff>“
or 2949
„Sync.
ϕ
-
diff>“
is available in the spontaneous messages.
The indication
„Sync. Udiff>“
indicates that the magnitude (ratio) adaptation is incorrect. Check address
215
Usy1/Usy2 ratio
and recalculate the adaptation factor, if necessary.
The indication
„Sync.
ϕ
-diff>“
indicates that the phase relation, in this example of the busbar voltage,
does not match the setting at address
212
Usy2 connection
(see Section 2.1.2.1). When measuring
across a transformer, address
214
ϕ
Usy2-Usy1
must also be checked; this must adapt the vector group
(see Section 2.1.2.1). If these are correct, there is probably a reverse polarity of the voltage transformer ter-
minals for U
sy2
.
• The program
AR Usy1>Usy2<
=
YES
(address
3517
) and
AR SYNC-CHECK
= (address
3515
) is set for
synchronism check.
• Open the VT mcb of the measuring point U
sy2
(No. 362
„>FAIL:U4 VT“
).
• Via binary input (no. 2906
„>Sync. Start AR“
) a measuring request is entered. There is no close release.
If there is, the VT mcb for the measuring point U
sy2
is not allocated. Check whether this is the required state,
alternatively check the binary input
„>FAIL:U4 VT“
(no. 362).
• Reclose the VT mcb of the measuring point U
sy2
.
• Open the circuit breaker.
• The program
AR Usy1<Usy2>
=
YES
(address
3516
) and
AR Usy1>Usy2<
=
NO
(address
3517
) is set for
synchronism check.
• Via binary input (No. 2906
„>Sync. Start AR“
) initiate the measuring request. The synchronism check
must release closing (message
„Sync. release“
, No. 2951). If not, check all voltage connections and
the corresponding parameters again carefully as described in Section 2.1.2.1.
• Open the VT mcb of the measuring point U
sy1
(No. 361
„>FAIL:Feeder VT“
).
• Via binary input (No. 2906
„>Sync. Start AR“
) initiate the measuring request. No close release is given.
• Reclose the VT mcb of the measuring point U
sy1
.
Addresses
3515
to
3519
must be restored as they were changed for the test. If the allocation of the LEDs or
signal relays was changed for the test, this must also be restored.