Configuration
5-35
7SA522 Manual
C53000-G1176-C119-2
Figure 5-29
Establishing the
task level
Within the Run Sequence menu, select
(GLW
, and then
3UHGHFHVVRUIRU,Q
VWDOODWLRQ
, to ensure that the function modules selected from the library will be im-
plemented into the desired task level (Figure 5-30).
Figure 5-30
Assignment of function modules to the selected
task level
The proper assignment is important for several reasons. For example, if interlocking
logic were to be set up in the measured values task level, indications would constantly
be created by the cyclical processing, filling the buffer unnecessarily. On the other
hand, the interlocking condition at the moment of a switching operation may not be
processed at the right time, since measured value processing is done only every
600 ms.
Table 5-7
Selection guide for function modules and
task level
s
Function Modules
Description
Run-Time Level
MW_BEARB
Meter processing
PLC1_BEARB
Slow PLC
PLC_BEARB
Fast PLC
SFS_BEARB
Interlocking
ABSVALUE
Magnitude calculation
X
–
–
–
AND
AND-gate
–
X
X
X
BOOL_TO_CO
Boolean to control (conver-
sion)
–
X
X
–
BOOL_TO_DI
Boolean to double point
–
X
X
X
BUILD_DI
Create double point annuncia-
tion
–
X
X
X
CMD_INF
Test
–
–
–
X
CONNECT
Connection
–
X
X
X
D_FF
D-flipflop
–
X
X
X
Summary of Contents for siprotec 7SA522
Page 20: ...7SA522 Manual C53000 G1176 C119 2 ...
Page 64: ...7SA522 Manual C53000 G1176 C119 2 ...
Page 89: ...SIPROTEC 4 Devices 4 25 7SA522 Manual C53000 G1176 C119 2 Figure 4 20 CFC Logic example ...
Page 408: ...7SA522 Manual C53000 G1176 C119 2 ...
Page 456: ...7SA522 Manual C53000 G1176 C119 2 ...
Page 516: ...7SA522 Manual C53000 G1176 C119 2 ...
Page 620: ...Appendix B 48 ...