Checklists and forms
C
C.1
Mechanical installation: Checklist
Logbook
Use the checklist below to guide you through the mechanical installation procedure for the
drive. Read the safety information at the start of these operating instructions before you start
working on the device.
Note
If the option in question is part of the delivery, check this accordingly in the right-hand column.
Check the boxes once you have finished the installation procedure to confirm that the activities
are complete.
Activity
Available
/completed
The environmental conditions must be permissible.
For additional information, refer to the technical specifications.
The drive must be properly installed on the provided fixing points.
The cooling air can flow unobstructed.
The minimum ceiling height (for unhindered air outlet) specified in
the operating instructions must be observed. Make sure that the air
supply is unobstructed.
Install the separately supplied components.
Establish the required mechanical and electrical connections.
The clearance around an open door (escape route) specified in the
applicable accident prevention guidelines must be observed.
For option M13/M78:
Select the required metric gland or PG gland appropriate for the
cable cross-section. Proivde the appropriate holes in the cover
plates. When the cable is fed in from above, ensure that enough
room is available if the cable has to be bent because of the cable
feeder and cross-sections. To prevent lateral forces on the entries,
insert the cable vertically.