Commissioning
4.1 Typical commissioning scenarios
Inverter with CU240B-2 and CU240E-2 Control Units
56
Operating Instructions, 07/2010, FW 4.3.2, A5E02299792B AA
Commissioning guidelines
,VLWQHFHVVDU\WR
FKDQJHWKH
IDFWRU\VHWWLQJ"
:KDWLQWHUIDFH
IRUFRQWURO"
&RPPLVVLRQLQJZLWK
IDFWRU\VHWWLQJV
3UHSDULQJ
FRPPLVVLRQLQJ
6HWWLQJIXQFWLRQV
&RQILJXULQJWKHLQSXWV
DQGRXWSXWV
&RQQHFWLRQWRDILHOGEXV
%DVLFFRPPLVVLRQLQJ
,QYHUWHULV
LQVWDOOHG
&RPPLVVLRQLQJ
FRPSOHWHG
1R
\HV
)LHOGEXV
,QSXWVDQG
RXWSXWV
$GGLWLRQDO
VLJQDOVYLDLQSXWV
DQGRXWSXWV"
1R
\HV
①
Preparing commissioning (Page 57)
②
Commissioning with factory settings (Page 60)
Commissioning with the BOP-2 (Page 68)
③
Commissioning with STARTER (Page 73)
④
Connection to a fieldbus (Page 103)
⑤
Configuring the terminal block (Page 93)
⑥
Figure 4-1
Commissioning procedure