7.2
Performing the configuration for the D4x5-2 offline
7.2.1
Overview
Introduction
In the case of offline configuration, the project is created while not all of the hardware
components (in particular drives) are available. In this way, a SIMOTION project in the office
environment can be created up to a point where a basic project specification including a
program exists. You can then load the finished project to the SIMOTION D4x5‑2 later and test
it with the drives.
Requirements
● For offline configuration, all of the components and their article numbers must be known.
● You have created a project in SIMOTION SCOUT and inserted a SIMOTION D4x5‑2 into
the project in the hardware configuration.
● You have configured the communication between the SIMOTION D4x5‑2 and the PG/PC.
See Section Creating a project and configuring the communication (Page 124).
Procedure
The offline configuration involves the following steps:
● Accessing the drive wizard (Page 176)
● Configuring components (Page 177)
● Downloading the project to the SIMOTION D4x5‑2 by means of one of the following options:
– Downloading to the target system (Page 197)
– Downloading to the CF card (Page 200)
– Downloading incl. sources and additional data (Page 201)
– Archiving on the CF card (zip file) (Page 202)
Note
During offline configuration, you can also configure the option board (TB30) and Terminal
Modules, e.g. TM41.
Commissioning (software)
7.2 Performing the configuration for the D4x5-2 offline
SIMOTION D4x5-2
Commissioning and Hardware Installation Manual, 03/2018, A5E33441636B
175