Commissioning
3-2
TP 070 Equipment Manual
Release 03/00
3.1
Initial Startup
Procedure
When the operating unit is started up for the first time, there is no configuration
loaded. Proceed as follows, observing the sequence, in order to download a
configuration from the configuration computer to the operating unit which is
necessary to put the unit into service:
Step
Procedure
1
Connect the operating unit interface IF1B (RS485) to the configuration computer
using a PC/PPI cable.
2
Switch on the power supply for the operating unit.
Since no configuration has been loaded at this point, the operating unit
automatically switches to Download mode. The operating unit displays the
message
Connecting to host
until it receives data from the configuration
computer or the button
Cancel is pressed.
Summary of Contents for SIMATIC HMI TP 070
Page 14: ...Functionality 2 2 TP 070 Equipment Manual Release03 00 ...
Page 18: ...Commissioning 3 4 TP 070 Equipment Manual Release03 00 ...
Page 34: ...System Settings 6 6 TP 070 Equipment Manual Release03 00 ...
Page 40: ...Communication Management for SIMATIC S7 7 6 TP 070 Equipment Manual Release03 00 ...
Page 54: ...Maintenance Upkeep 10 2 TP 070 Equipment Manual Release03 00 ...
Page 56: ...Operating System Update 11 2 TP 070 Equipment Manual Release03 00 ...
Page 57: ...APPENDIX A Technical Data B Interface Assignment C ESD Guidelines D SIMATIC HMI Documentation ...
Page 58: ...APPENDIX K 2 TP 070 Equipment Manual Release03 00 ...
Page 64: ...Technical Data A 6 TP 070 Equipment Manual Release03 00 ...
Page 66: ...Interface Assignment B 2 TP 070 Equipment Manual Release03 00 ...