Wiring
3-20
ET 200eco Distributed I/O Station
A5E00158716-02
How to wire the ECOFAST connector
Table 3-11 shows you the pin assignment of the ECOFAST connector
Table 3-11 Pin assignment of the ECOFAST connector
Pin
Assignment
View of the ECOFAST connector
(terminal side for incoming signals and
loop–through)
A
PROFIBUS DP Signal A
Signal A
B
PROFIBUS DP Signal B
Signal B
*
1
Electronic/sensor power supply
(1L+)
2
3
A
B
ECOFAST hybrid
cable
*
2
Ground potential, sensor power
supply (1M)
1
4
2 L+
3
Ground potential, load voltage
supply (2M)
1 L+
4
Load voltage supply (2L+)
*
Installation instructions are supplied with the Han Brid Cu plug or Han Brid Cu terminal box
package.
Summary of Contents for SIMATIC ET 200eco
Page 8: ...Preface viii ET 200eco Distributed I O Station A5E00158716 02 ...
Page 18: ...Product overview 1 6 ET 200eco Distributed I O Station A5E00158716 02 ...
Page 70: ...Commissioning and diagnostics 4 16 ET 200eco Distributed I O Station A5E00158716 02 ...
Page 116: ...I O address area C 6 ET 200eco Distributed I O Station A5E00158716 02 ...
Page 124: ...Index Index 4 ET 200eco Distributed I O Station A5E00158716 02 ...