ET 200eco PN
Operating Instructions, 06/2022, A5E01250250-AN
72
Commissioning
5
5.1
Commissioning ET 200eco PN
Introduction
Your automation system is commissioned depending on the current plant configuration. The
section below describes the procedure for commissioning the ET 200eco PN on an IO
Controller.
Requirements for commissioning the ET 200eco PN on the PROFINET IO
Actions
Reference
ET 200eco PN installed
Chapter Installing (Page 21)
ET 200eco PN wired
Chapter Wiring (Page 28)
The IO Device was assigned a device name
Chapter Configuring (Page 63)
ET 200eco PN configured
Chapter Configuring (Page 63)
Supply voltage for the IO Controller is switched on
IO Controller manual
IO Controller switched to RUN
IO Controller manual
Commissioning ET 200eco PN
1. Switch on the voltage supply 1L+ non-switched for the ET 200eco PN.
2. Switch on the supply voltage(s) 2L+ switched as required.
Summary of Contents for SIMATIC ET 200eco PN
Page 233: ...ET 200eco PN Operating Instructions 06 2022 A5E01250250 AN 234 Dimensional drawings C ...
Page 265: ...266 ET 200eco PN Operating Instructions 06 2022 A5E01250250 AN Open Source Software ...
Page 278: ...ET 200eco PN Operating Instructions 06 2022 A5E01250250 AN 279 Y Y cable 37 Index ...